Q1:What certification has your company passed? A: Our company has passed the ISO 9000 certification, SGS certification.
Q2:How long is the mold development cycle? A:It's usually 30 to 60 days.
Q3:How long is the service life of the mold? A:50,000 to 100,000 modules.
Q4:Does the facility provide OEM and ODM services? A:Yes.
Q5:What are the ways of surface treatment in the factory? A:Electroplating, shot blasting, electrolysis, spraying, oxidation, passivation, PVD, electrophoresis, etc
Q6:What kind of material does the product material classification have? A:Aluminum alloy castings, zinc alloy castings, stainless steel punching parts, stainless steel pipe fittings, stainless steel castings, cast iron parts, injection molding parts, copper parts, etc.
Q7:How long is the cycle time of mass production? A:30 to 60 days.
Q8:What is the port of shipment? A:Ningbo Port and Shanghai Port.