Share on (60723372740):
Sanitary Vertical Milk Refrigeration Tank & Storage Tank
vertical milk chill and storage tank(milk cooling tank, milk storage tank, milk tank, milk vessel)
Direct milk cooling tank is mainly used for cooling and storage for fresh milk, also can be used to cooling or storage for other liquid product. The cooling tank is the key equipment for the mechanical milking system in the dairy farms. Also widely used in the manual milking farm and milk collection centers, and milk production plants, which can keep the fresh milk at best state and prevent the bacterial growing.
Model | Diameter(V) | Rated Power(KW) | Refrigeration Capacity(W) | External Size(L×W×H, mm) | Total Weight(kg) |
BZLG-500 | 500 | 3.6 | 7380 | 1750×1150×1300 | 242 |
BZLG -1 | 1000 | 4.4 | 9280 | 1950×1350×1450 | 285 |
BZLG -2 | 2000 | 6.7 | 15820 | 3950×1550×1750 | 460 |
BZLG -3 | 3000 | 9 | 19534 | 3500×1650×1850 | 645 |
BZLG -5 | 5000 | 13.6 | 31640 | 4000×2050×2150 | 1150 |
BZLG -8 | 8000 | 19.6 | 47460 | 4700×2300×2400 | 1450 |
Shanghai Beyond Machinery Co., Ltd. is a professional machinery manufacturer based on technical developing. Combining with R&D, manufacturing, installation debugging and training, we are engaged in producing the liquid projects used in Dairy,Fruit &Vegetable,Juice,Beverage,Tea,Brewing,Flavoring, Pharmacy and Daily chemical products etc.
We have cooperated with the same occupations from domestic and international to introduce and develop many advanced procedures of manufacturing and designing.
With so many excellent staffs in technical and marke-ting, we are distributing in a more flexible and invig-orative working surrounding development and helping our customers more success in the corresponding areas by offering better products and service.




Q: What is the procedure to order chocolate machines?
A: Step 1: Contact our sales person to choose the best machine combination for your needs. And, If you want to purchase chocolate mass preparing machines, like chocolate melting machine or chocolate holding tanks, you just let us know what’s your request of the production capacity. If you already have part of those machines and want to buy a certain kind of machine, then the bought machine shall match with other machines. If you don’t know how to decide the size of machine, please consult us.
Step 2: Both parties sign contract with each other
Step 3: You make 30% down payment against contract
Step 4: We start the production after getting your down payment according our contract within the lead time.
Step 5: If product check before delivery is required by you, we will inform you the inspection time after the production is finished.
Step 6: You arrange the 70% balance payment before delivery
Step 7: Shipping
Step 8: If on-site installation and debugging is needed, our engineer will go to your factory after the machine arrives.
Q: Do You Provide Installation And Debugging Service In Our Factory If We Buy Your Machines?
A: Yes, our professional engineers can provide on-site installation and debugging service if you ask.f We Buy Your Machines?
Q: Do You Provide Warranty To Your Machines? If Yes, Then How Long?
A: We provide one year warranty after delivery to our machines.
Q: How Is Your Price And Quality?
A: We are aimed to provide the best product with the best price and the best quality. Our price maybe not the cheapest in the whole industry, but we are the cheapest for the same quality level. And we provide the best quality for the same price range.
New products from manufacturers at wholesale prices