Jiangmen Kaiping Deck Mount 2 Handle Kitchen Plumbing Faucet Pre Rinse Spray Unit for Dishwasher with CUPC Certificate

Share on (60725748773):


Price:$148.00 - $150.00

Quantity:


Product Overview

Description



_20201205090431

 

Jiangmen Kaiping Deck Mount 2 Handle Kitchen Plumbing Faucet Pre-Rinse Spray Unit for Dishwasher with CUPC Certificate


5801BP_01

 









Solid brass distinctive construction, durable and safety; hot and cold water supply


A: Reinforced at stress point , protects and extends life of hose.


B:Stainless steel hoses with double interlock.


C:Built-in water sealing washer , no need to apply PTFE tape.


D:Scratch Proof Gasket


E:1.42GPM (5.38LPM) Water Saving Spray Valve.


F:Brass Compression Cartridges with spring check


G:Hand Tighten Easy Installation , no special tool required.


H: Specially Designed Inlet with Filter , effectively filter impurities , we care for your health.















































 























Description:


Jiangmen Kaiping 2 Handle Kitchen Plumbing Faucet Pre-Rinse Spray Unit for Dishwasher with CUPC Certificate


Size:


68*32*9cm /pc box , 69.5*32.7*55.7cm (6pcs/carton)


Weight


GW:6.34kg/pc , GW:39.29kg/carton


Packaging Details


1pc/box , 6pcs/carton 













FAQ




Q1: What’s the difference between a Pre-rinse unit and a common faucet?
Pre-rinse unit is High temperature & high pressure resistant and more durable
Q2: Are you a trading company?
NO! We’re a manufacturing factory with over 13 years experience.
Q3: Where is your factory?    
Our factory is located in Shuikou town,Kaiping,Jiangmen City , 1.5hr drive from Guangzhou
And it’s our pleasure to arrange the pickup in Guangdong.
Q4: Do you offer OEM & ODM service?
Yes , product or packaging all available , we have professional R&D and sales team to understand customers’ needs.
For OEM, your brand logo can be lasered onto the product once receipt of your letter of authorization.
Q5: What’s your MOQ and what's the production lead time?
We accept 1pc order , and for order within 200sets , lead time is 7days
Q6: How do your control product quality?
We implement strict quality control system from raw material sourcing to finished products , we send sample products to run test in authorized lab every other months.100% inspection for each shipment before delivery.
Q7: How's lead time and cost of developing new prototype?
Different design, different leadtime and cost.
The prototype cost can be refund once total order quantity reach a certain amount.




0.1853 s.