Автоматическая 219 HF стальная труба, сварочная линия

Share on (60726265952):


Price:

Quantity:


Product Overview

Description



Product Description


 




Automatic 219 HF Steel Pipe Welding Line


pipe welding machine iuwon


Technology procedures:


Coil car→ uncoiler→ hold down roll and leveling machine→ shear & end welder →horizontal accumulator → leveling→ forming→ HF welding →scarfing→ cooling → sizing → turk head straightening →milling saw cut off→ run out conveyor→steel pipe automatic stacking machine (manual strapping)


Main Technical Parameter































































ItemPatameter
MaterialSlited hot rolled low carbon steel coil
Finished porducts RequirementRound pipe114-219mm
Square pipe90*90-170*170mm
Rectangle pipe100*80-200*100mm
Thicness2.5-8.0mm
Place requirementPlace typeSplit type
Loyout typeInput,Side output(look from main console,decided by customer)
Production speed0-45m/min
Uncoiler structureSingle-head hydraulic expansion unit
Cutting typeMilling saw
Coil weight≤15t
Bracking typeHydraulic brack
Blade materialT12A

ZY16-325 Erw Tube Mill Line

























































































ModelOutside Diameter(mm)Thickness(mm)Production Rate(m/min)
ZY167.6-160.3-1.00-100
ZY2010-250.3-1.50-100
ZY3213-380.6-1.80-100
ZY4516-500.7-2.00-90
ZY5020-63.50.8-3.00-80
ZY6025-761.0-3.20-80
ZY7632-891.2-3.750-80
ZY8935-1001.2-4.50-70
ZY12550-1302.0-5.00-60
ZY16576-1652.0-6.00-50
ZY21989-2193.0-8.00-50
ZY273100-2734.0-12.00-45
ZY32589-3253.0-12.70-40

Detailed Drawing


iuwon pipe weldingPICIMG_20141211_092928PICIMG_20141105_102426iuwon weld pipe2PICIMG_20141112_085433IMG_0700IMG_0701



Our Services


 


Installation (optional by the buyer)


a.After the machine arrives at the destination, the seller will send technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs provide some technicians to assist the installation work.


b.Installation period(The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technicians departure): 5 days


c.The buyer pays the installation charges to the seller’s appointed account before the technician departure: USD1,000 per set.


d.Training period: 2 days. (we can supply training on the operation spot if buyer needs)


e.The buyer pays the seller’s technician: Travel cost outside China (including round flight charges), accommodation and foods (at least three-star hotel with air condition), solve the language problem, provide transportation from living place to the work place, and insurance out of China, etc.


f.With in 3 months after arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.


 


Terms of Payment


30% to be paid by TT as Down Payment,70% to be paid by TT before delivery.


 


Time of Shipment


90 daysafter down payment(Including Chinese New Year Holiday for 20 Days)


 


Guarantee of Quality


The Seller shall guarantee the goods with materials and workmanship in accordance with the required on the drawings, brand new, unused and correspond in all respects with the quality, specification and performance as stipulated in drawings and guarantee a good smooth operation for 12 months after date of shipment (except consumables). This guarantee excludes the parts that require the normal plant maintenance. The guarantee is strictly limited to the repairing and the replacing of the mechanical parts supplied by us found to be defective provided that failure has occurred during the ordinary use of the equipment and it is not accepted and claim due to damage to people, property or loss of production.





Company Information


 


Our Factory



Exhibition



Certification


High Frequency Corrugated H Beam Steel Welding Production Line





FAQ


1), Q: Do you have after sales support?


 A: Yes, we are happy to give advice and have skilled technicians available across the world. 
 
2), Q: How do your machines compare with other big companies in this market?
A: We are up to date with the latest technology to improve our machines constantly.  We have experts from domestic-leading machinery corporation as well as sals elites. 
Wokers, traders, designed as a family to insure best interest of our clints.

 


3), Q: How does your factory do regarding quality control? 
A: Quality is priority. IUWON people always attach great importance to quality control during the whole process.  Every product will be fully assembled and carefully tested before packed.
 
4), Q: Do you sell only standard machines?
A: No, most of our machines are built according to customers specifications, using top brand name components.



 


 


Mob/WhatsApp:+86 18868400668


0.207 s.