Metal Sheet Steel Cable Tray Roll Forming Machine

Share on (60726594164):


Price:

Quantity:


Product Overview

Description


Metal Sheet Steel Cable Tray Roll Forming Machine


cable tray machine iuwon


Working Process


Decoiling→Leveling→Punching logo and holes→Servo Feeding→Punching long holes→Forming→Cutting→Outputting


Main Technical Parameter


 




























































































Item



Para



Memo



Suitable Material



Type



Hot rolled steel coil


Galvanized steel coil



 



Thickness



1.8mm -2.0 mm



 



Yield Strength



235-300MPa



 



Coil Width



194mm-408mm



 



Producing Speed



About 6 m/min



Including punching time and cutting time



Motor power of leveling device



5.5 KW



 



Motor power of servo feeding device



5.5 KW



 



Motor power of 110 tons punching device



11 KW



 



Motor power of 250 tons punching device



22 KW



 



Main motor power



11KW



 



Roller change motor power



1.5KW*2



 



Hydraulic station power of Decoiler



3KW



 



Hydraulic station power of Cutter



5.5KW



 



Total power



66.5KW



 



Power



AC380V,50Hz,3 Phase



 



Dimension (L×W×H, m)



About 30×4×4



 



Profile Drawing


profile drawing.jpg


Layout


layout.jpg


IMG_0223~1.jpgIMG_0242~1.jpgIMG_0250~1.jpgIMG_0252~1.jpg



Packaging & Shipping


 





Our Services


 


Installation (optional by the buyer)


a.After the machine arrives at the destination, the seller will send technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs provide some technicians to assist the installation work.


b.Installation period(The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technicians departure): 5 days


c.The buyer pays the installation charges to the seller’s appointed account before the technician departure: USD1,000 per set.


d.Training period: 2 days. (we can supply training on the operation spot if buyer needs)


e.The buyer pays the seller’s technician: Travel cost outside China (including round flight charges), accommodation and foods (at least three-star hotel with air condition), solve the language problem, provide transportation from living place to the work place, and insurance out of China, etc.


f.With in 3 months after arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.


 


Terms of Payment


30% to be paid by TT as Down Payment,70% to be paid by TT before delivery.


 


Time of Shipment


90 daysafter down payment(Including Chinese New Year Holiday for 20 Days)


 


Guarantee of Quality


The Seller shall guarantee the goods with materials and workmanship in accordance with the required on the drawings, brand new, unused and correspond in all respects with the quality, specification and performance as stipulated in drawings and guarantee a good smooth operation for 12 months after date of shipment (except consumables). This guarantee excludes the parts that require the normal plant maintenance. The guarantee is strictly limited to the repairing and the replacing of the mechanical parts supplied by us found to be defective provided that failure has occurred during the ordinary use of the equipment and it is not accepted and claim due to damage to people, property or loss of production.





Company Information


 


Our Factory


Exhibition



Certificate


Automatic Color Steel Floor Tile Making Machine




 


FAQ


 1), Q: Do you have after sales support?




 A: Yes, we are happy to give advice and have skilled technicians available across the world. 
 
2), Q: How do your machines compare with other big companies in this market?
A: We are up to date with the latest technology to improve our machines constantly.  We have experts from domestic-leading machinery corporation as well as sals elites. 
Wokers, traders, designed as a family to insure best interest of our clints.


 


3), Q: How does your factory do regarding quality control? 
A: Quality is priority. IUWON people always attach great importance to quality control during the whole process.  Every product will be fully assembled and carefully tested before packed.
 
4), Q: Do you sell only standard machines?
A: No, most of our machines are built according to customers specifications, using top brand name components.

 

 


Mob:+86 15356670927


Whatsapp:+86 18868400668



0.1964 s.