Share on (60728848318):



| Application | Axle of motor, centrifuge, protector and separator |
| Physical Performance | Good corrosion resistance,etc. |
| Surface Treatment | Polished |
| Material | WC+Co(Ni) |
| Material quality | 100% original materials |
| Advantages | HIP-Sinter and High accurate |
| Dimensions | Custom According to Customer's Drawing |
| Using Life | 20000 hours |
| Certificate | ISO9001:2008/ OHSAS18001:2007/ ISO14001:2004 |
| Keywords | Cemented Carbide Axle Sleeves |
1. Common cylindrical axle sleeve,
2. cylindrical axle sleeve with slot,
3. axle sleeve with convex stage,
4. axle sleeve with slot and convex stage,
5. non-standard axle sleeve, etc.
There is a big choice of sizes and types of products. We can also recommend, design develop, produce and supply the products according to the drawings and requirements of the customers.
Technical Level:
The product which is made of good quality materials, has good wear, corrosion resistance, outstanding mechanic properties, is weared only slightly through a long time running with higher accuracy. It's service life reaches over twenty thousand hours in the normal case.

Applications:
The cemented carbide axle sleeve will be used mainly for rotating support,aligning anti-thrust and seal of the axle of motor, centrifuge, protector and separator of the submerged electric pump in the adverse working conditions of high speed rotation, sand lash abrasion and gas corrossion in the oil field, such as slide bearing sleeve, motor axle sleeve, aligning bearing sleeve, anti-thrust bearing sleeve and seal axle sleeve.

Founded in 2010, Zigong Lituo New Material Corp.,Ltd is located in the Chinese famous tungsten carbide products city-Zigong.As a subsidiary of Zigong Zhongxing Wear-Resistant New Materials Co.,Ltd,we produce all kinds of tungsten carbide products and grind carbide parts into precision.

Standard export carton packing (carton box, plastic box, plywood box). We are responsible for the damage caused in the course of transportation.
10-20 days after advance payment, detail delivery date should be decided according to
products requirements and order quantity.


