Share on (60730371865):
Company Description
Xing Min Wei Ye Architecture Limited Corporation, which was established in 2006, located in Gold Coast Development Zone, the beautiful coastal city Qinhuangdao. It focused on researching Architecture Formwork Shoring Structure Scaffolding System, and already became a creative, high-technology, professional and experienced brand-new scaffolding manufacturer.
Xing Min Wei Ye aims at "No timber used during construction". Save the forest, and save the earth.
Main Products:
Concrete Slab Formwork Shoring System
XM Slab Formwork Type C
XM Slab Formwork Type B
Concrete Wall Formwork Type C
Adjustable U-head Screw/ Base Jace
Galvanized Punched Clamps
Steel Plank of Hot Dip Galvanized
XM Stair Formwork
Adjustable Steel Prop
Steel-timber Beam
Scaffolding Accessories
XM Rink Lock Scaffold System
Scaffold/Steel Pipes
Scaffolding Ladders
World Business
Now, XING MIN WEI YE scaffolding products have been exported to more than 50 countries and religions directly and indirectly. Many countires and regions in Europe, North America, Middle East and Asia. For example, Libya, Philippine, Mozambique, India, Bengal, Angola, Algeria, Russia, Romania, Congo, Brazil and so on.
We are pleased to welcome customers from all over the world.
-Vertical Beam:
It is a single square tube with adjustable length,to be nailed on the plywood. The normal size is 2.6-3.0m. Two vertical beams can be connected together to reach any height you need.
-Cross Beam:
Using single tube instead of double-tube, pireced with square holes. It can be connected with the vertical beam by the Tie rod & Nut and Beam Fastener.
-Cross Beam Connector:
Connecting two Cross Beams to reah any length you need
-Inner/Outer Corner:
It is used inside/outside corner to ensure the corner is straight.
-Beam Fastener:
Put into the holes of Cross Beam
-Tie Rod & Nut:
It is used along with the Cross Shape Spacer to secure the plywood.
-Cross Shape Spacer:
It can be easily connected with the Tie Rod & Nut
Q:What's your MOQ?
A: 20tons or a full 20'GP container.
Q: What's your packing methods?
A: Packed into bundle, and rest in bulk.
Q: What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/C 100%, or negotiate according to the order status.
Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.
Q: Are you manufacturer or trader?
A: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
Q: Where's your factory?
A: Our factory is in Qinhuangdao city (near Beijing) Hebei Province, afforded enough production ability and earlier delivery time.
Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
New products from manufacturers at wholesale prices