Share on (60737015001):
Model | SRT33 | SRT45 | SRT55D | SRT95C | SET230 | SET300 | SAT40 |
Engine model | Cummins M11-C350 | Cummins M11-C350 | CumminsQSK19-C700 | CumminsQST30-c1050 | CumminsQSK60-C2500 | CumminsQSK60-C2700 | Mercedes Benz OM502LA.E3A/5 |
Displacement | 10.8L(661in³) | 15L(915in³) | 19L(1,150in³) | 30.5L(1,846in³) | 60.2L(3,674in³) | 15.93L | |
Gear arrangement | 6 forward gears,1 reverse gear | 6 forward geas,1 reverse gear | 6 forward gears,2 reverse gears | 6 forward geas,1 reverse gear | 8 forward gears,4 reverse gears | ||
Transmission type of drive axle | First-stage spin chute gear main reducer+planetary wheel edge reducer | First-stage spin chute gear main reducer+planetary wheel edge reducer | First-stage spin chute gear main reducer+planetary wheel edge reducer | First-stage spin chute gear main reducer+planetary wheel edge reducer | |||
Brake type | Leading trailing shoe and cam type brake | Front dry disc brake,rear oil cooling disc brake | Front dry disc brake,rear oil cooling disc brake | Front dry disc brake,rear oil cooling disc brake | Front dry disc brake,rear oil cooling disc brake | Front dry disc brake,rear oil cooling disc brake | Engine exhaust brake+gearbox retarding+transmission shaft parking brake+axle oil cooling disc brake |
Tire | 18.00-25(36PR)E-3 | 21.00-35(36PR)E-4 | 24.00-35(42PR)E-4 | 27.00-49(48PR)E-4 | 40.00R57 | 53/80R63 | 29.5 R25 |
Rated dead weight capacity | 33t(72,600lb) | 45t(98,710lb) | 55t(121,000lb) | 95t(209,000lb) | 230t(507,000lb) | 290t(639,261 lb) | 39,000kg |
Heaped capacity(2:1) | 21.5m³(28yd³) | 29.5m³(38.6yd³) | 35m³(46yd³) | 60m³(79yd³) | 146m³(191yd³) | 211m³ | 24m³ |
Minimum turning radius | 7,400mm | 9,530mm | 9,540mm | 12,000mm | 14,200mm | 14,800mm | ±45° |
Maximum total weight of vehicle | 56,500kg(124,300lb) | 81,800kg(179,432lb) | 98,000(215,200 lb) | 160,000kg(352,000lb) | 393,000kg(866,000lb) | 530,000kg(1,167,888 lb)J | 68,000kg |



1>. Select proper equipment model;
2>. Design and manufacture products according to clients' special requirement;
3>. Arrange for visiting our factory, assist them to handle relative procedure, such as visa.
4>. Make sure goods prepared within delivery time;
5>. Pre-check and accept products ahead of delivery;
6>. Prepare documents required to help customer pass customs clearance.
7>. Help clients to make Project evaluation and feasibility analysis and draft solving plans.
1>. Assist clients to prepare for the first construction scheme;
2>. Install, debug and examine the equipment
3>. Train technical personnel the first-line operators;
4>. Provide technical exchanging
5>. Offer spare parts at a best price for long term.


New products from manufacturers at wholesale prices