Багажник кабеля нового стиля, разница между кабельным лотком и кабелем trunking 300*100 мм

Share on (60738548877):


Price:3,70 $ - 4,30 $

Quantity:


Product Overview

Description



Cable tray


Cable tray is divided into cable tray, cable trunking,cable ladder,wire mesh and other structures, by the bracket, arm and installation accessories and other components. Can be set up independently, can also be laid in a variety of building (structure) and corridor stent, reflecting the structure is simple, beauty in appearance, flexible configuration and easy maintenance features, all parts are required galvanized, installed in the building Outside the bridge, if it is in the vicinity of the sea or belong to the corrosion area, the material must have anti-corrosion, moisture resistance, good adhesion, high impact resistance of the physical properties.



Cable tray

Cable tray is the oil, chemical, light industry, television, telecommunications and other aspects of the most widely used. It has a reasonable reason, the load is large, beauty in appearance, simple structure, easy installation and so on. It is suitable for the installation of power cables, but also through the use of control cable laying. Its surface treatment is divided into two kinds of plating and painting, in the heavy corrosion environment can be special anti-corrosion treatment. 



Cable trunking

Cable trunking is a fully enclosed cable tray. It is most suitable for the laying of computer cables, letter cables, thermocouple cables and other high-sensitivity system control cables. It has a good effect on the shielding of the control cable and the protection of the cable in the heavy corrosion environment. 


Cable ladder

 Cable ladder has the advantages of light weight, simple structure, low cost, high strength, unique design, easy installation, good heat dissipation and good air permeability. It uses the minimum number of connecting bolts, The general diameter of the larger cable laying, especially for high and low voltage power cable laying.



Wire mesh

1. Maintenance and maintenance is simple.When the equipment is changed or changed, the open design section of the cable tray maximizes the observation of the cable, which facilitates the removal or increase of the cable, making maintenance and maintenance easier.
2. Installation is flexible.Relative to the traditional cable tray to be customized all kinds of elbows, tee, Stone, climbing and other accessories, mesh mesh without customization, according to the needs of the construction site quickly produced.

3. Reduce cable procurement costs and reduce energy consumption.The open design of the wire mesh provides excellent thermal performance, reduced cable performance attenuation, and the use of smaller cross-sectional cables to reduce cable purchase costs.



Application




Company Profile


Our company:

To give the best Service, Superior quality, Competitive prices fit for the needs and demand. Lead market trend.
1. Manufacture and Exporter.
2.Has 5 years experience making & designing quality cable tray management systems in china.
3.Has 6 years exporting experience in China.
4. Professional sales team works closely with each customer to provide quality solutions on time.
5.Involved in numerous organizations that further the betterment of cable system production & installation.





                            Xiaokai

Shanghai Xiaokai Building Material Co.,Ltd is a professional manufacturer which specializing in manufacturing and selling the modern constructive conduits, cable trays and C purlin and other relative products. The company located in the famous financial city – Shanghai.



                      Main products

 Main products including: HDG conduit, GI conduit, GI C purlin, SS cable tray, GI cable tray and others. Our products could be manufactured according the BS, UL, AMSI, JIS and GB standard which is widely used in the markets, hotels, power plant, underground construction and mansion. etc




Foreign trade team

We have the youngest and most powerful foreign trade team
1. All foreign trade personnel are 20-30 years old.
2. Some people are overseas students with 6 years work experience.

3.some people have 8 years of experience in foreign trade
4. Others just graduated, have unlimited creativity, full of vitality



Product Description




Type
Size
W(mm)
H(mm)
L(mm)
XK-CL-1
200*70
200
70
2000-6000
XK-CL-2
300*70
300
70
2000-6000
XK-CL-3
400*70
400
70
2000-6000
XK-CL-4
500*70
500
70
2000-6000
XK-CL-5
600*70
600
70
2000-6000
XK-CL-6
800*70
800
70
2000-6000
XK-CL-7
200*100
200
100
2000-6000
XK-CL-8
300*100
300
100
2000-6000
XK-CL-9
400*100
400
100
2000-6000
XK-CL-10
500*100
500
100
2000-6000
XK-CL-11
600*100
600
100
2000-6000
XK-CL-12
700*100
700
100
2000-6000
XK-CL-13
800*100
800
100
2000-6000
XK-CL-14
900*100
900
100
2000-6000
XK-CL-15
1000*100
1000
100
2000-6000


Packing & Delivery




Certification






Eight Advantages:

1.\tFull automatic steel cable tray production line.
2.\tAs a manufacturer, we could delivery more faster, 10days for a 20ft container.
3.\tCompetitive price, comparing with the distributor and warehouse, we are more cheaper.
4.\tFaster and effective solution to problem.
5.\tImporting the American advance metal cold roll forming technology, high product capacity; high precision.
6.\tUsing PLC control system for cutting the sizing products.
7.\tAutomatic production line for printing the code.
8.\tMaster the advance Techniques, use the well-equipped facility.



Related Products




FAQ & Connection


1.Q.Are you a factory or not?
A.Yes we are a leading cable trays manufacturer whose factory in Shanghai. Welcome to visit our factory.
2.Q.How about the Delivery Time?
A.The products will be produced since we get your deposit by T/T or your original L/C.For normal sizes,some stocks in our factory now,we can supply once you need.
3.Q.What kind of payment does your company support?
A.T/T,100% L/C at sight,Cash,Western Union are all accepted.
4.Q.What's your warranty?
A.Free samples;mill test certificate;shipping inspection or any third party inspection in your site.
5.What's your advantages ?
More than 100 employers who work at our factory.Key projects: the 2008 Olympic games venues,the 2010 Shanghai world expo exhibition hall,the capital international airport,etc.

.



0.1995 s.