Share on (60743515128):
KP8020 IEC 60587 high voltage evaluating resistance to tracking and erosion testing machine ASTM D2303
1. Electrode: 0.5mm thick Material: Stainless steel;
2, the upper and lower electrode distance: 50.0mm ± 0.1;
3, test voltage: 100V-10000V stepless adjustable;
4, regulator: Output: 0 ~ 250V adjustable;
5, test transformer: the highest output voltage AC 10KV (or DC 12KV can be set through the touch screen);
6, high-precision regulator: output AC220V accuracy of ± 1%;
7, when the loop current is 60mA, cut off the voltage output;
8, test time: 6 hours;
9, drop accuracy: 0.5%;
10, voltage stability: ± 1%;
11, tracking judgment:
According to the standard GB/T6553-2003/4.1.2, the voltage (2.5kV, 3.5kV and 4.5kV) is applied to the sample, and a certain flow rate drops the polluted liquid. The current below 60mA continues for 6H. Flow is passed;
12. Dropping device:
Revel precision peristaltic pump, flow rate 0.00185 ~ 20 ml / min, working speed 0.1 ~ 50 rev / min, flow accuracy error: <0.5%;
13, the output voltage: AC / DC (switchable)
14, the number of experimental groups: five groups
15. Control device: Siemens PLC + Taiwan Wei Lun touch screen control, precise control, simple operation, fully humanized design, automatic generation of report after the test is finished, the panel thermal printer can print test results at the right time;
15, studio volume: 900L * 650W * 950H (mm); volume is 0.56m3.
16, chassis: SUS304 stainless steel (drawing surface);
17. The sewer tank is made of 316 stainless steel and a sealed device is installed.
18, the instrument dimensions: 1330L * 910W * 1880H (mm)
19, weight: about 400KG
Wooden packing
24 hour online technical support and 100% quality warranty for 12 months except consumable parts.
Our vision : created a century brand success for centuries
Our mission : to promote the progress and development of the most cost-effective automation technology
Our values : customer first, teamwork, loyalty, dedication, passion, dedication
Our business purpose : to satisfy customers, employees, businesses of both material and spiritual well-being
Our quality policy : quality is life, progress endless; service is fundamental, innovation to win
Our commitment : no excuses
Our two style : serious, fast
Our three thanksgiving : thanksgiving customers to create my performance,thanksgiving my career platform company, thanksgiving working with my colleagues
Dongguan Huiyue Automation Equipment Co., Ltd. FAQ:
Q: What is the power supply of the machine?
A: The standard power supply in china is 220v 50Hz. We also can customized accordingly.
Q: Our required parameter is not standard,can made to order?
A: Our machines can made to order according to customer’s requirement.
Q: What information should the customer provide to get an accurate quotation from us?
A: The customer should provide the related technical requirements, drawings, pictures, etc
Q: What is the payment term?
A: T/T , L/C.
Q: What is the delivery time?
A: Normally the delivery time of the machine is 4-5 working days after receive payment.
Q: What is the warranty period of the machine?
A: The warranty period is one year.Lifetime Maintenance
New products from manufacturers at wholesale prices