MJL folding frameless glass door tempered glass lowe glazed sliding folding door

Share on (60748573491):


Price:USD 92.00 - USD 122.00

Quantity:


Product Overview

Description



Product Description




Specification


item
value
After-sale Service
Onsite Inspection, Online technical support, Onsite Training, Onsite Installation, Free spare parts
Project Solution Capability
total solution for projects
Profile thickness
1.4, 1.6, 1.8, 2.0 mm
Glass type
Double/triple/low-e/reflected/laminated/tinted glass, etc
Size
Customized Size
Color
Matt black;white;ultra silver;nature clean aluminium;customized
Flyscreen
Stainless steel security mesh, fiber flyscreen, retractable flyscreen
Surface treatment
Powder coating, Anodized, Electrophoresis, Fluorocarbon coating
Position
Exterior




Project case














Company Profile








FAQ

Q: Are you a factory or Trading company?
MJL established in 2012, with 3 production bases, a total of 300,000 Square feet, a window door, and Curtain wall manufacturing factory which located in Guangzhou, where the city held the Canton fair twice a year. A warm welcome to visit our company, just 45-minute drive from the Airport.

Q: Can we use our own door design?
A: Yes, MJL offers the design-built-ship-install guide service, for commercial project customers and dealers. Based on the project's local situation, our engineering team designs the product with fix solution to meet the project’s requirement, from drawing to production, Topbright covers you all.

Q: Where is your factory located and how can I visit you?
A: We are located in Guangzhou city. After you arrive at Guangzhou airport, we can pick you up there.

Q: What information is needed to order parts for my product?
A: It is important to have as much detailed information as possible. Proper measurements for sash/panel replacement, as well as your product series number are necessary for us to place an order for you. If needed, visual aides, such as emailing pictures of your product, can also be of assistance.

Q: What's the production time?
A: We will start to make the production after we get deposit. Normally, it needs around 45 days for producing.






0.2056 s.