City/Coach/Electric/Passenger Bus For assembly plant Project In Africa (60754274337)

Share on:


Price:RUB 76,139,900.00
Price in USD:Details

Quantity:


Product Overview

Description

About US,  We are China buses manufacturer, search for parter of oversea Chain's buses assembling plant project in developing countries,
tried to find practical cooperation model, development model, Our favorable cooperation models characteristic is take advantage of China's products, technology advantage, financial advantage, and with your local network resources, market resources to set up oversea chain automobile manufacture factory projects.
          If you interest in know more about our oversea chain automobile manufacture factory projects, we’d like to deliver relevant information to you and explain all the aspects in detail. Our chain auto assembly plant projects include mini cars, mini trucks, pickups, SUV, mini Moke jeeps, CNG bus Series (airport buses, new energy buses, electric,powered buses,  and Hybrid buses) etc. We have established a lot of chain auto assembly factory in many developing countries, such as  Syria, Egypt,Ghana, Nigeria, Angola, Mozambique,Bangladesh,and Latin America etc. Our cooperation  principle is to achieve a winwin situation. We are glad to provide technologies or other type of investments.Our cooperation ways range from trade cooperation to setting up auto assembly plant with local partners in joint  venture mode.
 Our bus model:
1.jpg
What is CBU SKD, CKD 
CBU = finished automobile
CKD = Completely  Knocked down parts . All materials supplied loose for final welding and final assembly, or raw body shell and all other parts loose and not assembled.
SKD I = Semi knocked down parts.Car body and trucks cabin are unpainted.The engine,gearbox,axles,suspension,driveshaft, steering,seats,tyres,batteries,exhaust system,electrical,etc.are supplied as individual units for assembly. 
SKD II = Car body is fully painted and glazed.Truck cabin is fully painted.The engine, gearbox, axles,suspension, driveshaft, steering, seats, tyres, batteries, exhaust system,electrical etc. are supplied as individual units for assembly.
2.jpg
Auto assembly plant by Turn Key Project and Joint Venture model:
1. Definition of our Turn Key Project:
The turn key project is aiming at offering you an easy and quick approach to enter the automobile industry, we will help you to establish an assembly factory and provide you automobile parts for
 assembling first,we export parts to your side under SKD or CKD in order that great much cost will be cutted, we help you design and build up the assembly plant as well as provide you necassery and 
detailed  technology assistance till you master all required technologies and be capable to make vehicles on your own totally.
2, Joint Venture model: we invest technology, equipment and necessary liquidity, while you provide land, workshop building and necessary liquidity, joint venture company management according to incorporated company.
 
Partner requirements of cooperation or joint venture term: 
1, Fund: have some economic strength, investment capacity over two million USD.(don't include land, plant workshop)
2, workshop: 5000-8000 square meter workshop at least, and over 15000-20000 square meters land. 
3, Market channel: have car sales channel (sales network) or car garage remanufacturing second-hand car, or with the car related businesses.
4, Import tariff policy: Your country import tariff policy very nice, gap of import tariff between auto spare part CKD (completely knocked down) term and CBU (complete built unit) shall be at least 30-35%;
for example, import tariff on CBU term is 35%, CKD term must be 5% or free. This term is most important factor for setting up an assembly plant in local.
If your company can meet 3 term or more of the above basic conditions, contact us freely, we will discuss the details of cooperation to start the project;If your company have not met above requested economic 
strength, our cooperation way will be arranged to start from trade first, then creating positive conditions, developing to buld auto assemble plant step by step.
 
3.jpg
How much investment  is need to do the bus assembly factory project ?
1, equipment investment budget,  One is the easiest, the annual production of 500-800 vehicles, the simple version of the bus line equipment budget, about half 
million dollars;In addition, the equipment budget for the upgraded version of the bus production line will be completed in the next production line of 2000-3000 buses
equipment investment budget is about 2 millions USD.
2, Workshop over 8000M2, land over 20000M2.
3, worker is obout 50-150.
4,  Work capital 3-5 millions USD.
5.jpg
 Welcome to join Chain buses assembly plant project  
0.008 s.