High Temperature Lab Furnace 1200C 1800C Tubular Furnace with PID controller for Vacuum or Atmosphere Sintering

Share on (60762431836):


Price:

Quantity:


Product Overview

Description



Product Description

High Temperature Lab Furnace 1200C - 1800C Tubular Furnace with PID controller for Vacuum Atmosphere Sintering


 


This tube furnace uses resistance wire (Swedish Canthal A1) as heating element, double-layer shell structure and 30-stage program temperature control system, phase shift triggering, thyristor control, and furnace polycrystalline fiber material. It has the advantages of temperature field balance, low surface temperature, fast temperature rise and fall, energy saving, etc. It is an ideal product for high-temperature atmosphere sintering, atmosphere reduction, CVD experiment and vacuum annealing in universities, research institutes and industrial and mining enterprises.


Detailed technical parameters


































































































































Type



1200-I



1200-II



1200-III



1200-V



1200-VI



1200-VII



Power



3.5KW



3.5KW



3.5KW



5KW



6KW



7KW



Tube size (OD(mm)



Dia 60 X1000



 Dia80X1000



Dia100X1000



Dia150X1000



Dia200X1000



Dia250X1000



Dimensions



1140X450X690



1140X450X690



1140X450X690



1110X530X755



1120X580X805



1314X680X905



Supply voltage



220V



Phase



Single phase



Heating element



Resistance wire imported from Sweden (resistance wire guaranteed for 2 years)     



Temperature control


 



UAV program temperature control instrument (standard)


1, 30-stage program temperature control intelligent PID adjustment.


2. With over-temperature protection, the electric furnace heating circuit is automatically cut off when the temperature is over-temperature or broken, (when the electric furnace temperature exceeds 1200 degrees or the thermocouple is blown, the AC relay on the main circuit will be automatically disconnected, the main circuit is broken. On, the ON light on the panel is off, the OFF light is on, and the limited protection electric furnace).


3, with 485 communication interface (standard when purchasing software)


4, with power-off protection function, that is, when the power is turned on after the power is turned off, the program does not start from the starting temperature, but the furnace temperature rises from the time of power failure.


5, the meter has the function of temperature self-tuning


 1575597544(1).jpg


(you need to pay extra for the replacement of imported instruments, optional)


 1575597567(1).jpg                                                              


 FP93 temperature controller (shimashima, Japan)  European instrument    Touch screen instrument



Chamber material


 



1. High-quality high-purity alumina polycrystalline fiber curing furnace formed by vacuum suction filtration.


2. Formed by Japanese technology.


3. The spacing and pitch of the resistance wires in the furnace are all arranged according to the best thermal technology in Japan, and the temperature field is simulated by the thermal software.



Valve and flange



   



60/80/100 top view



                                         



Temperature calibration (optional)



Regular temperature calibration of the tube furnace maintains the accuracy and uniformity of the furnace temperature. You can purchase a simple calibration tool from the company to assist you with this work. The complete calibration kit includes a standard thermocouple S-type, temperature calibrator.


         



Control accuracy



 +/- 1 ℃



Trigger



                                   Phase-shifted trigger



Electric appliance



Zhejiang chint



Silicon controlled



                                    106/16E SEMIKRON



Maximum temperature



 1200 ℃



Rated temperature



 1150 ℃



Heating rate



 ≤30 ℃/ Min (it can be modified as required)



Recommended rate of temperature rise



≤15  ℃/ Min



Thermocouple Type



K Type



Heating length



400-440mm



Constant temperature length



150mm



Temperature field curve





Peripheral surface temperature



≤45℃



Open cover protection system



When the furnace cover is opened, the relay will automatically cut off the main power supply, effectively ensuring the safety of the user.



3.png
 


df.jpg





Our Company & Team



QQ20170504194454_.jpg999999.jpg






Certifications



coating machine with Drying Oven


CERTIFICATE


Strength Proof


All our products are passed the inspection standards included SGS, CE, ASTM with 100% quality.







Cooperative Partner



coating machine with Drying Oven






Packaging & Shipping




PACKAGE:


     1 Standard exported package: Internal anticollision protection, external export wooden box packaging.


     2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.


     3 Responsible for the damage during the shipping process, will change the damage part for you for free.


 


DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.


coating machine with Drying Oven







FAQ



About Product

 1.Which procedure to secure your Quality?


Our company has own research & development and production base, the products have been calibrate by central laboratory professionals before before they leaves the factory, ensure the accuracy of test results and authority.

2.How about your company product after-sales service system?

Product after-sale guarantee period is 12 months,and we can provide lifetime repair guarantee.We have agents in some countries,they can provide door-to-door service.If there is no agent,our professional pre-sales and after-sales department can reply you within 24 hours for any technical problems.

3.Products standards?

Our instruments adopts ISO, ASTM, DIN, EN, GB, BS, JIS, ANSI, UL, TAPPI, AATCC, IEC, VDE and other international testing standards.

4.Our country's power supply and plug are different, how do you solve it?

We can according to different countries and the power plug, equipped with transformer and plug that in accordance with your local requirement.

5.Payment methods?

T/T, L/C, D/P and so on

6.Packing method?

Standard export wooden box packaging

7.How about customers evaluation for your products?

Our company has established long-term cooperation with the SGS, Bureau Veritas, TUV and Intertek,our high quality products and first-class after-sales service.Our services get the trust of the customer satisfaction and recognition for themselves.

8.Main export market?

Now our products have been exported to North America, Europe, southeast Asia, South America and other countries.

10.How to ensure the customer standard use the instrument?

We can provide each product related video showing how to install and operate.If you have specific needs, we also can arrange engineer to the customer's company for equipment operation training.

 

About Shipping

 1.Order processing?


Please allow a processing time of 12-24 hours for your order(s) to ship. Equipment orders will take up to 2 weeks before leaving our warehouse. (Order processing is done during normal weekdays only, no holidays or weekends.)
2. Shipping methods?
1 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
2 Responsible for the damage during the shipping process, will change the damage part for you for free.
3.Order tracking?
Online order can be tracked by login to your account. Please allow 24 hours after order is shipped to see logging details.
If you need a tracking number for your order, please send an email to us with your order/invoice number.
4. Import/export tax, duty, GSM, Customs Clearance, and etc?
All import/export related expenses are sole responsibility of the buyer; charges will vary from country to country. Please consult with your local import experts or transportation carrier for more details.
5.Lost or Stolen packages?
Please report all lost or stolen packages to us at the earliest possible time. An investigation will be open soon after reporting the incident to us, and a final ruling will be issued by the carrier for the claim after 10-15 business days. A replacement package will be sent as soon as the claim is accepted by the responsible carrier.

 





 


4.7436 s.