Share on (60763226558):
Product Name | Power Plan Boiler Steam Drum Water Drum |
Applied Area | Natural circulation boiler |
Drum Shell Plate Material | - Carbon Steel : Q245R, P265GH, SA516-Gr.60/65/70 - Alloy Steel : Q345R, Q375R, 15CrMoR, 12Cr1MoVR, P355GH , DIWA353 |
Drum Head Material | Same as shell |
Nozzle Tube Material | As per design |
Standard | China GB, ASME, EN |
Manufacturer Grade | China A Grade, ABS Certificated, TUV Certificated |
Working Temperature | Saturation Temperature at rated pressure |
Working Pressure | 1.6 MPa ~ 22.5 MPa |
Shell Plate Thickness (Drum Wall Thickness) | ≤150 mm |
Drum Diameter | ≤3,200 mm |
Drum Length | ≤25,000 mm |
Welding | - Shell : SMAW, SAW - Nozzle tube : GTAW (TIG), SMAW |
Welding NDT | - Shell longitudinal seam : 100% RT, 100% UT - Shell circumferential seam : 100% RT, 15% UT - Nozzle tube angle seam : 100% UT, 100% MT |















Different packing methods are chosen depend on transportation type.
A: General small equipment will be ready for shipment in 20-25 days if the materials are in stock, or in 35-40 days if the materials are not in stock.
Large equipment delivery time should be determined after technical discussion. Please contact our sales.
A: Yes, we could offer the sample tube or sample materials for free charge, but the cost of freight should be paid by Customer.
A: General small equipment, the 100% of contract price should be paid after signing. Alibaba third party guarantee is available.
Large equipment payment schedule, please contact our sales.
A: General small equipment we guarantee 12 months from the date of shipment departure.
Large equipment warranty period is 12 months from the date of commissioning or 18 months from the date of shipment departure which occurs earlier.

New products from manufacturers at wholesale prices