Share on (60764614129):
Product Name | 6 points Stainless Steel Boiler Steam Water Sampling Cooler for Middle Pressure and High Pressure Boiler |
Sampling Points | - 6 points : Saturated Steam x 2 Continuous Blow Down x 2 Feed Water x 1 Superheated Steam x 1 |
Sampling Lines | 6 Piping Lines |
Shell Material | Stainless Steel : 304 |
Tube Material | Stainless Steel : 304 |
Rack Material | Carbon Steel |
Standard | China GB |
Manufacturer Grade | China A Grade, ABS Certificated, TUV Certificated |
Matched Boiler | 5 t/h ~ 670 t/h |
Steam Temperature | < 560 ℃ |
Cooling Water Temperature | < 30 ℃ (to be confirmed by Customer's plant design) |
Cooled Medium Temperature | < 37 ℃ (depend on Cooling Water Temperature) |
Working Pressure | < 20 MPa |
Welding | Automatic GMAW, GTAW(TIG) |
Dimension | 2,500 L x 700 W x 1,800 H mm |
Instruments | Pressure Gauge for Medium (0 ~ 20 MPa) Cooling Water Temperature Gauge (0 ~ 200 ℃) |
- Pressure Gauge for measured Steam/Water (0~20 MPa) for each line
- Temperature Gauge on each cooling water tank
- Separate stop valve for each line

- Hand wash tap x 6
- Hand wash basin x 6









Different packing methods are chosen depend on transportation type.
A: General small equipment/parts will be ready for shipment in 20-25 days if the materials were in stock, in 35-40 days if the materials were not in stock.
Large equipment delivery time should be determined after technical discussion. Please contact our sales.
A: Yes, we could offer the sample tube or sample materials for free charge, but the cost of freight should be paid by Customer.
A: General small equipment/parts, the 100% of contract price should be paid after signing.
You could sign with us via Alibaba Trade Assurance Order online service, or via traditional offline type.
Large equipment payment schedule, please contact our sales.
A: General small equipment we guarantee 12 months from the date of shipment departure.

New products from manufacturers at wholesale prices