NBHY1400 400T 0.15 ripstop silnylon tarp fabrics

Share on (60767768834):


Price:

Quantity:


Product Overview

Description


Product Description
Composition100%  nylon
Weight (g/m2)53gsm
Yarn20D N FDY* 20D N FDY
Structure0.15 Ripstop Weave
FinishOne side silcone coated. The other side PU 4000mm
Width57"-58"
PackingIn roll.You can choose other ways.
Delivery15-20 Days after deposit receipt and lab dips or strike off confirmed
PaymentT/T or L/C in sight
ServiceCustomized Design, Test Report

    The fabric woven by 20D nylon yarn. This makes the fabric ultralight ,soft handfeel and surface smooth. About 1.6oz/y2 after two side coated

    One side silicone coated

    The other side is PU 4000mm coated (Good waterproof function)

    The fabric is good choice for lightweight silnylon tent, light silnyon tarp, light silnylon backpack.

 

 
 

silnylon tarp fabricssilnylon tarp fabrics

      We have nylon fabric from 10D to 2520D.

      And for lightweight nylon, we have 10D, 15D, 20D, Fulldull, semidull, bright...

      With different weave of plain, ripstop, dobby, twill...   

      Color is customized.

 

 

Company Information

silnylon tarp fabrics

silnylon tarp fabrics

silnylon tarp fabrics

silnylon tarp fabrics

silnylon tarp fabrics

FAQ

Sample Rules
We offer you free sample book or A4 size samples as your requirement. If you are the first time to cooperate with us, the postage should be paid by you. When you make the order, we will return it back to you. 
Lap Dips & Strick-Offs
1) For dyed fabric: Confirm the colors from Pantone Book, and we will finish it in 2-4 days.
2) For printed fabric: Confirm the designs, we will make strick-offs for approval before the bulk production, and it will spend about 5-7 days.
Payment 
We accept T/T (30% deposit in advance, the balance before shipment) and L/C.
The priority is trade assurance provided by Alibaba. Our trade assurance amount is about $180000. 
Other payment terms are waiting to be allowed. 
About Quotation
1) Usually we quote within 24 hours after we get your inquiry.
2) If you are very urgent to get the price, please call us 
3) The price is changing always. You need to confirm the price again before order 
Delivery time
1) Usually it takes 15-20 days after confirming lab-tips and deposit received, if quantity is big, negotiate further.
2) If the grey fabric is shortage, then it takes 30 days for weave
3) Urgent order: Please send e-mail to negotiate with us 
If my purchasing quantity cannot up to MOQ, how to do?
Please feel free. Just let us know the designs you want, if it is far from our MOQ:
1) We will recommend some other similar designs which can be ordered in small quantity.
2) If your delivery time is not urgent, we will arrange production with surcharge.

CONTACT US

silnylon tarp fabrics


0.198 s.