Discharge uniform kubota wood chipper

Share on (60773880960):


Price:$45,000.00 - $50,000.00

Quantity:


Product Overview

Description


Discharge uniform kubota wood chipper

IMAG1150.jpg

 

Application:

Widely used in wood chips making factory, biomass power plant, industrial boiler factory, wood shavings plant, high-density fiber planmts

 

Raw Material Used:

The raw material contained wood log, branch material, plate skin, waste veneer, wooden waste, bamboo, cotton rods and other wood fiber rods, and it can cut these materials in different wood chipper size.

 

Product Advantage:

1.Advanced structure, high quality cutting chippers, wide scope of application, simple operation, easy maintenance

2.Wear-resistant sharp alloy tool, reliable advanced and to enhance its service life

3.Wearing parts low-consumption, low running cost.

Specification:

ModelPower(KW)Capacity(t/h)
B21655+4+3+1.54-6
B218110+5.5+4+1.58-12
B2113220+7.5x2+1.5

15-20

 

Packing and Shipping

.jpg

 

Workshop Picture

.jpg

 

Our services:

1) 24 hours online service

2) Site-Commissioning

3) One year warranty and lifetime maintenance

4) Original Spare Parts Guaranteed

1111111.jpg

 

FAQ & Contact Us

Q1: What should the raw materials be?
A1: Wood logs, timbers, tree branches, twigs with the feeding size is not more than 300mm. It also can chip the non-wood materias, like sugar cane, bulrush, gross bamboo and so on.
 
Q2: Can the final size of wood chips be adjusted?
A2: Yes. It can be adjusted according to customer's request.
 
Q3: Is the wood chipper designed with conveyor?

A3: Yes. This wood chipper is designed with 4m feeding conveyor, 10m discharging conveyor and electric cabinet.

 

Q4: Can i get some discount if i buy this machine from your company?

A4: Yes. We will give you the most favourable price; if buy more than two sets, the big discount will be given.

 

Q5: What is your payment term?

A5: 50% TT payment in advance, 50% TT payment before shipment.

 

Q6: How long is your delivery time?

A6: Within 10 days for single machine after getting the down payment; 

25-35 days for the whole production line after getting the down payment.

 

.png

 

 


0.2085 s.