Share on (60774615734):
Cast steel wcb y strainer RF end y type strainers
Design Specification :
Design and manufacture : ASME B 16.34
Face to Face: ASME B16.10
Flange end: ASME B16.5
Butt welded: ASME B16.25
Valve test: ASME B16.34, API 598
Special: NACE MR-0175
Feature
-Heavy Duty Construction
-Compact design
-Full Bore
-Bolted or threaded cover
-10 Meshes to 200 Meshes;
- Drain Plug is optional;
-Stainless Steel renewable Screen
-Renewable strainer density
-Flange end or Weld End




Passed the quality system authentication
Completed QC,QA system
After Sale Service over the world during 24 months
Our Workshop
Our Warehouse
Our Team

Packaging Details:Sea Worthy or accrding to the requirement of customers
Delivery Time:35-40 days after receiving your order confirmation

Project Name:Lemongrass Methol Project
Project Location:Jalan Gebeng 2/1,Gawasan Perindustiran Gebeng,26080Kuantan,Pahang ,Malaysia
Description:Ball Valves Steel (Inc.Ball Valves with Deadman's Handle)

Reference:MEPS/PO-22300303/2013-SO22300412
FOLLOWING INFORMATION SHOULD BE IN DRAWING\t
EPC CONTRCATOR: GALFAR ENGINEER & CONT CO\t
CLIENT PO NO: 131 13 403384\t
PROJECT NAME: OFF DELIVERY CONTRACT 2013 HPG WELL(TIE-IN SIDE)\t\t\t\t\t\t\t\t\t

CCeference:GAP/PO-201712Rev.02KSFLOW-AIRGP
FOLLOWING INFORMATION SHOULD BE IN DRAWING\t
EPC CONTRCATOR: GALFAR ENGINEER & CONT CO\t
CLIENT PO NO: 131 13 403384\t
PROJECT NAME: OFF DELIVERY CONTRACT 2013 HPG WELL(TIE-IN SIDE)\t
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
New products from manufacturers at wholesale prices