Share on (60776450153):



RD60 | |
Rated Production Capacity | 60t/h |
Oil Consumption | 6.5kg/t |
Figure Dimension | 36m×18m×13m |
Total Power | |
Operation | Manual, auto manual, auto |
Cold Aggregates Supply System | Cold aggregate hopper:4×6.5m³ |
Conveyer belt width:500mm | |
Drying Drum | Φ1.2m×5.2m |
China Brand Light Oil Burner | Rated oil consumption:400kg/h |
Hoisting System | Hot aggregate elevator:1×5.5KW |
Filler elevator:1×2.2KW | |
Vibrating Screen | Four layers |
Weighing system | Hot aggregate weighing hopper:700kg; Weighing accuracy:±0.15% |
Filler weighing hopper:80kg; Weighing accuracy:±0.15% | |
Asphalt weighing hopper:50kg; Weighing accuracy:±0.1% | |
Mixer Capacity | 800kg/batch |
Dust Collecting System | Gravity dust catcher + Cyclone dust catcher + Water dust catcher |
Filler Supply System | Filler temporarily storage silo:1×0.4m³ |
Oil burning heating asphalt Tank | 1×20m³ |
Electric Control System | Control room:3m×2.2m×2.5m |
Control system: PLC+touch screen |

1.Modularized design, easy installation and transportation;
2.High performance, save energy drying drum system;
3.Strictly test vibrating screen system;
4.High accuracy weighing system;
5.High-efficiency mixing system adopt twin-shaft batch mixer;
6.Famous brand air compressor and high quality pneumatic system used;
7.Easy & stable control system.

Chengjing 60tph Mobile Asphalt Mixing Plant



Chengjing 60tph Mobile Asphalt Mixing Plant
Packaging details: The spare and accessory parts are packaged by fuming wooden box,but the bulk cargo are packaged by nude packing,for example,the drying drum,bitumen tank,filler silo,control room and so on.




New products from manufacturers at wholesale prices