3 Phase Dual Power Generator Change Over Automatic Tranisfer Switch AC DC 200 AMP 50/60HZ AC400V CN;ZHE 63 2P HOLSO WHITE 400V

Share on (60776617885):


Price:$15.00 - $20.00

Quantity:


Product Overview

Description


AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch


AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch1



Product Description


 




    Dual Power Automatic Transfer Switch (A.T.S for short) applies to the terminal double-loop power supply system that 50Hz/60Hz, rated operating voltage 220V(2p),380V (3p and 4p), rated current 10 ~ 63 A. It can automatically switch the normal power to reserved power to prove the reliability of power supply, mainly used for fire pumps, smoke fans, elevators, pumps, lighting in high-rise buildings, shopping malls and other places.
    When the main power supply is normal,using the automatic model,the circuit breaker of reserve power supply is off,the circuit breaker of main power supply is on.When one phase or all three phase of the main power supply is off,the ATS will convert to the reserve power supply(the reserve power is normal),when the main power is normal,the reserve power will recover back to main power again.


 


PRODUCT PARAMETERS


 









































Rated Current 63A
OperationManual/Automatic
Working Frequency50HZ/60HZ
ATS ClassCB
Rated VoltageAC400V
Conversion Time<2S
Product Size185*138*115(mm)
Conversion ModeAutomatic Return
DisplayPilot Lamp

AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch3


CHANGE OVER SWITCH


   PRODUCT DETAILS


AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch2


 


  CHANGE OVER SWITCH



Size


 AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch4




 


AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch5


 


AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch6


 



Related Products


 

















 


 


 



Company Information


 AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch7


AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch8





Buyer Feedback


 




AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch9



Packaging & Shipping


 




Packing & Shipping


1. By Express: DHL, UPS, Fedex, normally 4-5 working days for delivery, (suitable for samples)


2. By Air: if package gross weight is over 45KGS, 5-7 days for delivery, (suitable for trial order)


3. By Sea: the most economic shipping method for bulk order, (suitable for bulk order)


4. We can arrange all shipment matters or you arrange your shipping agent or forwarder


 


AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch10


 



FAQ


 




AC DC 200 AMP 3 Phase Dual Power generator change over Automatic Tranisfer Switch11


Contact Us


 



Contact Us



 


AUTOMATIC TRANSFER SWITCH


0.1995 s.