Share on (60780319678):
New design top quality heating anti-static raised floor system
| Size | 500*500/600*600 |
| Thickness | 30/35/40mm |
| Certificate | ISO9001 |
| Finish Material | PVC.etc |
| Color | grey |
| Application | Data centers |
| Product Keywords | anti-static floor system |
Description:
It is made up by drawing the high quality steel plate with spot welding, spraying plastic and the lumen is filled with froth cement; its surface affixes the decorating plate of high temperature resistant and non-flaming; it around is setting the electric filler rod, bracket, handle girder with whole galvanization; the height of bracket can be adjustable with auto-locking function.
Feature:
1).Designed specially for computer room, control rooms, etc
2).The raised floor consist of following parts"
a) 30mm or 35mm thickness cement core panel
b) 4 pieces of black PVC strips along the side of panel
c) Covering: HPL/PVC/Ceramic
d) pedestal, stringer, screws
3).Light cementitious fill makes panel solid and quite
4).Completely non-combustible; class A flame spread and smoke development rating
5).Easy and quick accessibility, resist pollution, easy to clean, durable
Application:
The anti-static raised floor is used in all kinds of computer rooms widely, especially in school's computer rooms such as in multimedia classrooms, computer rooms, etc.
Raised access floor installation:
1.At first, cleaning the ground.
2. Observe the layout of room, install infrared paralleled scanner, mark paralleled line on half waist of wall, then find lowest and highest point, calculate average value from ground to floor surface(this average value equals to owner’s required installation height),calculate and adjust the pedestal height
3.Choose a corner as start point, find a parallel on wall, tie two paralleled wax wire 595mm from wall, the wax wires are hard to brake and extend, two wires must be vertically distributed.
4.When pulling the paralleled line, screw the four pedestals. After confirming the height and placing the first floor, stringers and pedestals must be fix with screws, use level bar to adjust floor, at last, lock nuts on the pedestals.
5.When the first floor is adjusted paralleled, vertically place two lines of floors in the direction of wax lines.
Note: black glued edges between floors must be aligned and straight.
6.After vertically placing two rows of floors, find a direction,(cannot be vertically placed), paralleled place row by till the last row.
Note: each edge should remain one row for final cutting and placing, when paving, floors cannot be treaded which may affect flatness .
7.After placing last row, iron angles in each corner should be firstly fixed, then cut all-round floor.
Noted: iron angle should be paralleled to installed floor. backing if iron angle should possess a support(flitch or angle bar).
8.After fixing iron angle, exercisely
measure the size of floor, hen cut and places it. If need placing plug, se cutting machine to open holes as per actual dimension.
9.After placing floor, heck on time, Adjust the parts which are not flat. Finally fill in gap when cutting with glass cement
10.If the temperature difference between day and night at construction site is big,(eg. high altitude, temperate area or arctic area),all the edges should remain 3mm gap.
Notice:
Check & acceptance:
After placing all floors, check whole project carefully and improve all the imperfect parts.
1.When walking on he floor, no noise, no movement and good stability.
2.Clean surface, clear pattern, mean color and joint, straight edged, no crack, no corner
dropping, no lack of edge etc.
3.All materials of joint edge and dimensions should follow design requirement and construction regulation.
Cross maintenance instruction of raised access floor
1.Supporting place of floor cannot set other construction tools.
2.Before offering floors, they cannot be treaded. In case that it must be treaded when
cross maintenance, the relative person should ask for permission of man whose charge
on site
3.Construction company cannot use floor when floors are not been protected by letheroid.
4.Surface of floors cannot be placed on heavy weight scaffold.
5.Feet of ladders, light scaffold should be covered with thick rubber.
6.Paint,chemical materials are forbidden on surface of floors.
7.Hammering with hammer or heavy things is forbidden.
8.Scratching with knives or hard things is forbidden.
9.When welding, protect surface of floors with three-ply board etc. to prevent welding sparkles from dropping on floor.
10.No water on floorings
11.If rolling materials, equipment or gang boxes across installed access floor, then 1/4 inch tempered masonite or 1/2-inch plywood should be used as pathways to avoid any damage to the top surface the A/F panels.
The guide to use and maintain access floor
1.the installing surface of access floor should be level.
2.The temperature and relative humidity in the computer room where install access floor should be controlled to 10~30℃ and RH 35%~75%.
3.The surface of access floor should be away from chemical products.
4.When cleaning the floor surface, we cannot use water direct on it, we can use a wet mop and squeeze out the water and mopping on it.
5.The sun light should not shine direct on the surface of floor.
6.The persons work in the computer room should wear soft bottom shoes.
7.We must use professional panel lifter to lift panel.




Uusally the anti-static raised access floors are shipped by 20ft containers, as the floor is heavy ,about 12-16kg per pcs. 20ft container can ship the raised floor and accessories about 500 square meters .
5-20 days after confirming order,detail delivery date should be decided according to products types and order quantity.

Changzhou Basic Computer Room Equipment Co.,Ltd is an export oriented access floor manufacturer with design, producing and installation. Basic has been certificated in ISO9001, ISO14001 Enviroment System.
Basic covers an area around 30,000 sqaure meters. And more than 200 workers are working in factory now. Basic’s major products include OA Intelligent Building Access Floor Series, Anti-static Steel Access Floor for Computer Room, Conductive Vinyl Tiles for Clean Room,Steel Perforated Floor,Calcium Sulphate Access Floor, Woodcore Panel and Electrical Floor Box.Our annual production capacity is more than 1.2 million square meters. Products manufactured by Basic has been exported to over 20 foreign countries, such as Canada, Singapore, Taiwan, Brazil, Africa and Middle East,etc.
New products from manufacturers at wholesale prices