PT 250T TWIN RAM HYDRAULIC TRACK PRESS

Share on (60780680947):


Price:RUB 156,145.80 - RUB 780,729.00

Quantity:


Product Overview

Description

Special devices

Stationary and portable hydraulic press for small , medium and large-size track chains

Lubrication devices for chains, rollers and idlers

Electromechanical track shoe wrench for screwing and unscrewing the shoe bolts on tracked vehicle chains

Track winder is designed for winding large , medium and small-size chains .

 

1.A detailed description 

    (1)Track link press machine , press link machine .

   150tons, 200tons ,250tons, 300tons  fit for all kinds of track link . 

    Quality guarantee at least 1.5 years .

    Special design to make your work easier .

    Including ,Hydraulic press motor , rolling machine ,and rolling frame .

    (2)Such as 300 Tons Hydraulic Link Press Machine Assembly including:for your reference:

     Hydraulic machine 2. Rolling machine and 3. Frames.

     It can fix (assembly or disassembly) different pitches (<228mm) of track links like PC60~PC400,  D2~D8.

     The working voltage of standard motor is 220V/380V   50HZ. (110V 60(50) Hz are available)

 

2.Some pictures for your looking about hydraulic press machine for track chain.if you offer us model ,then we can make sure which model you need.

 

20110505_.jpg0.JPG

 3. Chart.

 

 Name         QtyNote
pc
300 Tons Twin Ram Hydraulic Track Link Press MachineRolling link machine1Motor 3KW, 220V/380V   50HZ  
Twin Ram Hydraulic machine1Motor 5.5KW, 220V/380V   50HZ  
including packing 
Frame43 suqare,
1 triangle
Assembling Mold6154,171 ,175,190,203,216 pitch
Disassembling Mold21pc for <203pitch
1pc for >203pitch
    

 

4.As long as you provide chart, the chain of parameters according to your offer can make different types of chain link.

 

CAT320 SK200 E200B _.jpg

5.Certificate.


111_.jpg22222222_.jpg
   

 6.Operational guidelines

(1)The working efficiency for assembling link is 10-14sets per hour

How to assembling link. please see video here?

//www.tudou.com/programs/view/974WduRtksc/  

//www.tudou.com/programs/view/KJ2QnT2TIeQ/

//www.tudou.com/programs/view/d1JYSkskCzI/

//www.tudou.com/programs/view/13qcBGg06HU/

(2)The working efficiency for disassembling link is 6-8 sets per hour.

How to loose link , please see the video here?

//www.tudou.com/programs/view/miIdDvR2IS0/

//www.tudou.com/programs/view/0f_pdXTPtEw/

How to roll the link?

//www.tudou.com/programs/view/1b6Av-XtPNE/ 

How to move link?

//www.tudou.com/programs/view/fXrDQHbwras/ 

//www.tudou.com/programs/view/1g3bYK_obxc/

 

 

 

 

0.1921 s.