tinplate high speed cut to length line machine cut to length rotary shear

Share on (60786300645):


Price:RUB 34,933,737.00

Quantity:


Product Overview

Description

Product Description

 

Main Technical datas for tinplate high speed cut to length line machine cut to length rotary shear :

1.

application

Stainless steel,Aluminium,Hot rolled,Cold Rolled

2.

Thickness of coiled plate

0.3-1mm

3.

Width of coiled plate

1300mm

4.

Slitting speed

0-80m/min

5.

Loading capacity 

15T

6.

Coil I.D

510/610mm

7.

Coil O.D

≤2000mm

8.

Diameter of leveling roller

 65

10.

Number of leveling rollers

 19

11.

Length accuracy

 ±0.5mm/m

12.

Levelling accuracy

 ±1.2mm/ m2

13.

Direction of feed material

from Right to Left or Left to Right(customized

14.

Power Supply

customized

LIST OF EQUIPMENTS UNDER SCOPE OF SUPPLY for tinplate high speed cut to length line machine cut to length rotary shear :

1.    Hydraulic Coil car

2.    Hydraulic Decoiler

3.    Hydraulic entry guide

4.    Four/Six hi leveler

5.    Loop bridge

6.    Side guide roller

7.    NC servo feeder leveler

8.    Measure system

9.    Shearing Machine

10.  Conveyor table

11.  Pneumatic discharge device 

12.  Hydraulic lifting table

13.  Unloading stacking car   

14.  Hydraulic Systems

15.  Pneumatic Systems

16.  Electrical System PLC Control

Layout for tinplate high speed cut to length line machine cut to length rotary shear

 KJF100.jpgrotary shear 2.jpg

 

 KJF.jpgcut to length line.jpg.jpgKJH40-2-1300.jpgKJH50-3X1600.jpg

Company Information

 Kingjime machine Limited is a TaiWan of Chinese technological enterprise manufacturer with Japanese technology to make steel coil cut to length line ,slitting line ,High Frequency pipe mill machine,feeder machine .We owned National high and new technology enterprise with 40 patents and intellectual property rights over the last for years.welcome to kingjimemachine as they!
we have established steady cooperation with customers in over 58 countriesworkshop.jpgoffice.jpg

 

customers

 our customers.jpgcustomers.jpg

Exhibitions

In Canton Fair,Brazil Fair,india Fair,Indonesia Fair,Russia Fair,Vietnam Fair,Thailand Fair,Germany Fair,Malaysia Fair:  exhibition 1.jpgexhibition.jpg

Certifications

 certificate 1.jpgcertificate.jpg

Packaging & Shipping

 

1.    Package: Machine devices will be Naked and all the roller parts will be antirust             treatment to protect the rollers. All the spare parts will be collected into the homemade steel boxes.spare parts in wooden packing.

2.    Delivery: 60-120 days

3.    Container: 2x40HQ and 1x20GP

4.    Shipping: All the parts in the containers will be strengthened with the container to prevent the deveices from being slipped

 

Our Services

 

 Step1:   know what machine you need

 Step2:   design the specific technical plan as per your request

 Step3:   Discuss and negotiate

 Step4:   Sign contract and place order

 Step5:   arrange production

 Step6:   Finish the production and inspect machine

 Step7:   Shipping

 Step8:   Apply visa for installation engineers 

 Step9:   Install machine and teach your operators

 Step10: After-sale service

 

FAQ

 

(1) What is your advantages?

A1:More than 20 years experience in manufacturing the machines. Professional and rich experienced..

A2:We are a manufacturer, not the trading company. So we can provide the strong and powerful service before and after sales.

A3: Can produce 4 lines per month 

(2) Do you have after sales support?

Yes, We have a 25-person -professional and strong installation team. And Will provide the machine life time service for you. Any problem , contract us and we will solve for you.  

(3) How to visit your company?

Our factory is located in Dongguan city, near HongKong,Shenzhen and Guangzhou. So there are two ways to our factory. One is by flight, direct from HongKong or Shenzhen or Guangzhou Airport. Another is by fast train, from Guangzhou East train station to Zhang Mu Tou train station. We will pick you up at the train station or airport

(4) What information you need to prepare the quotation:

1. coil thickness(min-max)

2. coil width(min-max)

3. what kind of your material

4. weight of your coils(max)

6. how many tons you need per day or per month

0.1846 s.