PP PE HDPE LDPE Plastic bottle washing recycling machine

Share on (60787313030):


Price:

Quantity:


Product Overview

Description


Product Description

This series washing line is widely used to recycle Waste HDPE/PP/PE Bottle/milk/plastic bucket/plastic crates/plastic lump etc.

This Washing recycling machine could be displayed "L" or "U" shape according customers workshop. 

Standard system process line:
1.Conveyor belt→Plastic crusher (wet crush)→Friction washer loader→Float washing tank→Screw loader→vertical plastic dewatering machine→Hot air dryer system→Silo

Advance system process line:
1.Conveyor belt→Plastic crusher (wet crush)→Friction washer loader→Float washing tank→Screw loader→High speed friction washing dewatering machine→Float washing tank→Screw loader→Horizontal dewatering machine→Hot air dryer system→Silo


2.Conveyor belt→Single shaft shredder machine or Double shaft shredder machine→Conveyor belt→ Plastic crusher (wet crush)→Friction washer loader→Float washing tank→Screw loader→High speed friction washing dewatering machine→Float washing tank→Screw loader→Horizontal dewatering machine→Hot air dryer system→Silo

Advanced System Machine parameter
\t
Model
\t
Capacity
\t
Total power
\t
Water supply 
\t
Manual
\t
Dimension
\t
MEB-300
\t
300kg/h
\t
130KW
\t
5-6 CBM/H
\t
1~2
\t
38*4.5*5m (L*W*H)
\t
MEB-500
\t
500kg/h
\t
145KW
\t
6-8 CBM/H
\t
1~2
\t
38*4.5*5m  (L*W*H)
\t
MEB-1000
\t
1000kg/h
\t
190KW
\t
8-10 CBM/H
\t
2~3
\t
43*5*5m  (L*W*H)

Standard System Machine parameter

\t
Model
\t
Capacity
\t
Total power
\t
Water supply 
\t
Manual
\t
Dimension
\t
MEB-300
\t
300kg/h
\t
100KW
\t
4-5 CBM/H
\t
1~2
\t
20*4.5*5m (L*W*H)
\t
MEB-500
\t
500kg/h
\t
115KW
\t
5-6 CBM/H
\t
1~2
\t
20*4.5*5m  (L*W*H)
\t
MEB-1000
\t
1000kg/h
\t
125KW
\t
7-8 CBM/H
\t
2~3
\t
23*5*5m  (L*W*H)
Machine Layout
Machine Photos
Our Certifications
Our Service

1.Pre-sale: we given client the details technician offer, sign the sales contract etc
2.In-sales: we supply the details layout, installation instruction, technician support for the clients
3.After sales: we arrange engineer to install the machinery and training the workers for client
4.We have 24 hours team to solve the after sales problem
5.We have free spare parts with the machine
6.We supply long term spare parts for every customer
7.We always update the new technology to every customer

Our Company
LOGISTICS

0.1969 s.