Share on (60789606196):

OEM/ODM | Available, 1 order can be customized. |
Incoterms | EXW, FOB, CIF |
MOQ | 1 Piece |
Payment | Trade Assurance, T/T, Paypal, Western Union, Money Gram |
Payment Condition | Full Payment or 30% Deposit,70% before delivery |
Packaging | Neutral Carton or Wooden Case. Inside: Foam |
Shipment | By Sea, Air or Express dlivery |
Technical Support | Lifelong |
Warranty | 12 months. Any problems during warranty period, we will provide component replacement. |
Attention:
1.Water cycle start button:After the water cycle is started, the water flow begins to continue to circulate. Remember not to cover the sink, otherwise the damage of the instrument is man-made and not covered by the warranty. If you want to close the sink lid, you must turn off the water circulation before you can close the lid and do the shampoo treatment
2.Hot water start button:Before opening the hot water start button, first add 2500 ml of water into the sink before starting the button, the water in the sink will be heated by itself, not empty burning, if not empty burning, instrument damage belongs to human, not within the warranty.
3.Atomization start button: Before opening the atomization start button, first add the water in the atomization cup to the scale line of the cup, do not add water beyond the scale line, then start the button and start working,Empty burning is strictly prohibited, otherwise the atomization cup and hot burn need to buy, the instrument burn need to buy, these are man-made damage, are not within the warranty.
When the steam in the atomizing hole starts and the steam stops automatically, it is necessary to add water in the atomizing cup in time. If the customer is not patient, turn off the atomizing switch and continue to operate for 5-8 minutes. If the customer is resistant to temperature, do not turn off the atomizing switch.
At any time, it is necessary to ask the customer about the water temperature of the water cycle and the temperature of the atomized steam. If it is unacceptable, it is necessary to close the atomization switch and turn off the hot water start button to avoid scalding.
4.Photon start key:Photon start, photon equipment and lamp in spa basin start to work, photon therapy, photon development.
5.Shower start button:Before opening the shower start button, put the shower inlet pipe into the hot bucket and then turn on the switch, turn on the shower switch in the sink, the shower head water starts to flow out, it takes time to spray, please wait patiently.
6.Power supply: the instrument can start working only after power supply is started.
Note: Before operation, you must inject 2500ml water, plug in the power, turn on the power switch, turn on the power switch on the panel.



Matters needing attention
1, when moving the machine should be kept level, to avoid vibration and collision.
2. When cleaning the equipment, turn off the power and pull out the plug.
3, the instrument should be thoroughly cleaned after use, so that the instrument will always be as new and increase the life of the instrument.
4. Do not disassemble, repair or transform the instrument without authorization (it may cause faults or accidents).
5. Be sure to turn off the power switch and unplug the power plug after using the instrument.
6, this product should pay attention to fire prevention, sun protection, moisture-proof, anti-impact, accessories and tools should be properly placed.


New products from manufacturers at wholesale prices