Share on (60791128609):
| Product Name | Eco Friendly factory price new launched sushi tray boat with logo |
| Keyword | new launched sushi tray boat |
| Product Name | Sushi Bridge |
| Material | Wood |
| Size | (L*W*H) 46*23.21cm, 30*17*10cm |
| Color | Natural |
| Type | Sushi Tools |
| Usage | Food Display |
| Application | Japanese Restaurant/Hotel/Household |
| Shape | Bridge Shape |
| Package | 1pcs/color box, 20pcs/CTN |
| OEM and ODM | Acceptable |
| MOQ | 200 PCS |
| Sample time | About 7 days |
| Delivery time | 30-40days |
| Craft | Only Hand Made |
| Customized | size, logo, shape & packaging can be made according to clients' required |







Question 1: how long will you deliver the goods on board?
Answer: 30~40 days for 1x40HQ; 20~30days for 1*20feet.
Question 2: What is the payment term you hope?
Answer: T/T 30% deposit & 70% against copy BL or LC at sight.
Question 3: How to avoid insect quality?
Answer: Our products after high temperature, fumigation and disinfection, less 12% moisture content. Storage time 2 years is not moldy.
Question 4: how to control the quality well?
Answer: control the raw material one by one step.
- check raw material sample before mass production
- quality checking during 20% mass production
- quality checking during 80% mass production
- quality checking before sending raw material to producing department.
- Dry material 5~12 hours, QC check the products by professional Moisture instrument.
- Polishing to smooth with approx 3~8 hours.
- Pack the goods with accurate quantity with counting machine.

New products from manufacturers at wholesale prices