Comparison of different formwork system
Description | Timber Formwork | Light duty steel mould | Heavy duty steel formwork | Aluminium Formwork |
Formwork material | 12 - 18mm plywood | 2-3mm steel plate | 5-6mm steel plate | 4-8mm aluminium plate |
Formwork thickness | 12 - 18mm | 55mm | 80-85mm | 4mm |
Formwork weight | 10.5kg/sqm | 35-40kg/sqm | 80-85kg/sqm | 20-25kg/sqm |
Load Capacity | 30KN/sqm | 30KN/sqm | 60KN/sqm | 60KN/sqm |
Recycle use time | 5 | 100 | 250 | 300 |
Difficuty of work | Easy | Medium | Difficult | Easy |
Cost of maintanance | Low | Low | High | Low |
Construction efficiency | Slow | Slow | Fast | Fast |
Labour requirement | Need skillful carpenter | Skillful labour not required | Skillful and trained personal | Skillful labour not required |
Quality of concrete surface finishing | Rough surface, low quality | Rough surface better than timber | Good finishing | Good finishing |
Recovery value (Crap value) | Lowest | Low | Medium | High |
Heavey machinery requirement | None | None | Reruired full time | None |
Enviromental | Not enviromental friendly, produce conctruction waste. | Less construction waste | Enviroment friendly | Enviroment friendly |
Remark
This comparason made based on 30 floors of construction of high rise building and mass housing project which will use the formwork in regards of high repetition.




1.Q-:Can I use this set of formwork to another project?
A.Yes, there are nearly 70% standard panels can be common reused.
2.Q-:What's your packing methods?
A.Protection foam+heat contracted plastic film. / wooden packing(non-fumigation)/ Metal pallet or depend on clients special requirement.
3.Q-:What's your payment terms?
A.T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C100%, or negotiate according to the order status.
4.Q-Are you manufacturer or trader?
A: GETO is the manufacturer of aluminum formwork system for 10 years. Our group as 4 factories, covering raged every scaffolding systems.
5.Q-:If I don't have construction crew knew well about your forwmork system, what can I do?
A.Well, we will send one or two field specialists to your construction site for guidance if you require.
6.Q-:Do you have pre-mocking up service?
A. Yes, we have pre-mocking up service, it depends on customer, sometimes, our clients need the cargo urgently, then they do not need pre-mocking up, normally,we will do pre-mocking up to our customers
7.Q-:How to proceed an order for aluminum formwork?
A.1- Please provide completed project drawings to us.
2- GETO designer will work out formwork solution base on project drawings.
3- Construction details confirmed, sign sales contract and receiving deposit.
4- To work out shell drawings and modulation drawings.
5- Have meeting for confirming formwork model details
6- Production.
7- Acceptance and check.8- Shipping