Wall hung gas boiler parts gas burner

Share on (60797980463):


Price:$14.50 - $15.00

Quantity:


Product Overview

Description



Product Description




Panel Material
430 rusty iron
Gas input pressure
2000 pa for NG, 2800 pa for LPG
Manifold Material
Iron with two-layer anticorrosive paint
Outlet model
40mm,3/4 or follow your requirement
Bracket Material
430 rusty iron and Galvanized sheet
Space between nozzles
20.5mm(17/19mm optional)
Weight
1.85 KG
Air-tightness
100% air-tight test
Measurement
380*90*170mm
Packaging Details
Wooden box
Rows
13 rows
MOQ
500 Piece
Nozzle size
1.25mm for NG
Avilable lines
5-30 lines
Heating load
26-28KW
Port
Zhongshan/Foshan





Detailed Images












Other Products






Our Company




Zhongshan LY burner Co., Ltd. is located in Asia's largest home appliance production center. We are a professional manufacturer of wall hung gas boiler parts and gas water heater parts, set design, development, manufacturing as a professional manufacturer.We focus on a series of wall hung gas boiler accessories, a wide range of diversity, reasonable price and on-time delivery.



Packing & Delivery


Our most professional packaging
Transport of large trucks to the seaport
And international transport cooperation


Our Service


1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. after sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer
the solve way for you.



Certifications






FAQ


Q1. What is your terms of packing?
A: Generally, we pack our goods in wooden box and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.

burner

gas burner

Wall hung gas boiler parts gas burner



0.2042 s.