Share on (60798860065):








Series | SLD401 Series Steel sliding door with Hardware kit |
Material | Steel and Steel sheet |
Thickness | 1.0mm to 2.5mm thickness |
Glass | Single tempered glass 4mm or 5mm |
Surface treatment | Powder coating |
Color | Option Clear , Frosted, Acid etc |
Size | Option Black , White, Grey etc |
Handle | Customized handle ; steel handle or aluminum knob |
Hardware kit | Customized roller style ; Top loading type , Horseshoe shape, Elongated etc |


























Q1: WHAT IS YOUR MAIN PRODUCT? |
A: We can supply the Steel door , barn door , shower room , aluminium complete system (including profile, glass, hardware, accessories) as well as the finished products ready for installation. |
Q2: WHAT’S YOUR PRICE? |
A: The price is based on buyer's specific requirement, so please provide below information to help us quote exact price to you. |
1) Shop drawing / window schedule to show the window opening way, dimensions, quantity ; 2) Option color /size 3) thickness of glass ( 4mm or 5mm or double glass 5+9a+5mm else) 4) colour of glass (clear, tinted, reflective, Low-E or others, with Argon or without). |
Q3: WHAT IS THE STANDARD SIZE OF YOUR WINDOWS AND DOORS? |
A: Our product is CUSTOMER MADE. We always manufacture windows and doors according to buyer's dimensions. |
Q4: WHAT IS YOUR DELIVERY TIME? |
A: For the series we stocked 20 working days with 300 sets , For the series unstocked 40 working days with 600 sets |
Q5: WHAT IS YOUR PAYMENT TERMS? |
A: 30% - 50% of total amount by T/T as deposit when confirmed the order and balance paid by T/T before loading container. |
Q6: WILL WE NEED TO INSTALL THE GLASS (ONSITE GLAZED) OR DO YOUR WINDOWS COME WITH THE GLASS INSTALLED? |
A: We will install glass at factory based on windows/doors dimension to make sure they can be safe during transportation and if easy for you to install the whole windows/doors on site glazed are recommended for big sized products. |
Q7: WHAT IS YOUR WARRANTY ? WHAT DO WE DO IN CASE OF PROBLEMS? |
A: 5 years quality warranty is provided, including frame unfading nor peel-off, hardware and accessories working properly under correct operation. |
In case of our quality problem, we will provide replacement by international courier. Immediate delivery of replacement parts with available in stock, and if not stocking, the time should be depending on material ordering time which is normally 10-15 days. |
Q8: WHAT KIND OF SERVICE WILL YOU PROVIDE? |
A: We are able to provide the engineering as well as supervising service to guide installation our windows and doors, curtain wall as well. |