Share on (60801802212):
Custom cheap hotel furniture, hotel furniture liquidators florida




| Standard Size | |||
| No. | Item | Dimension | Quantity |
| 1 | Bed | 2000/2200*1800*400 | 1 |
| 2 | Side table | 530*450*500 | 2 |
| 3 | Writting desk | 1200/1600*600*750 | 1 |
| 4 | Mirror | 700*25*1000 | 1 |
| 5 | Writting chair | 550*500*750 | 1 |
| 6 | TV cabinet | 2000*400*600 | 1 |
| 7 | Luggagecabinet | 800*550*580 | 1 |
| 8 | Leisure chair | 720*820*840 | 1 |
| 9 | Ottoman | 550*500*450 | 1 |
| 10 | Center table | diameter 550*560 | 1 |
| Total | 11 | ||
The above data for reference only, all can be customized.
| SPECIFICATIONS | |||
| Item | high quality wooden new modern contemporary contract hotel furniture | ||
| Certificate | ISO14001, ISO9001, OHSAS18001, CQC, CCEL | ||
| No.Standard | EU | ||
| Description | 1) Based Material for casegood furniture: Plywood/MDF with natural veneer and Technology veneer,Melamine,Laminate 2) Fabric/PU leather: High-grade fabric/PU leather provide from Seller's side; ( Fire retardant, SR 50,000 rub ). 3) Foam:Fire Retardant meets CA117 and BS5852 standard 4) Solid wood:ruber wood,Ash wood,Oak wood,Teak wood. 5) Lacquer: High scratch-resistant and environment-friendly finishing. 6) Hardware:DTC,Blum,hafele,etc. 7) S.S:Grade 201,301,304 and 316 stainless steel 8) All joint ensured to be tight and uniform before shipping. 9) Special treatment of acid and alicikl resistance, insect prevention and anti-corrsion. | ||
| Dimension | Fit with room design/ Any size customized | ||
| Payment Terms | T/T 30% deposit, T/T 70% balance before shipment, L/C | ||
| Delivery time | 30-45days | ||
| For more product information, please click | Contact Us >> |




Q1 : Are you manufacturer or trade company ?
A : We are manufacturer , our factory located in Guangzhou ,China and welcome to visit.
Q2 : Can I make customized for the furniture ?
A : Yes , the material and size can be changed as per as your requests .
Q3 : How long is the sample lead time ?
A : Sample lead time 4-5 days if you don't need customized .
Q4 : How long is the production lead time ?
A : Actually , it depends on the order quantity and the products . Production lead time 30-45 days .
Q5 : What's the MOQ of the products ?
A : MOQ is 2 sets .
New products from manufacturers at wholesale prices