Share on (60812042722):
Reusable toddle Training pants
1. 100% CottonWaterproof diaper Pant factory
2. 5 Layers-- Extra padding in the front and back,water resistant and better water imbibition than normal underwear.
3. 100% Cotton---Soft and breathable material ,more comfortable and healthy!
4. Leg Gusset---Leg gusset design to avoid leak and nice thick cushiony lining for absorbing accidents
5. Stylish Color--- Neutral patterns look great on both boys and girls
6. Durable, washable and reusable for multiple uses.
| Product Type | Cotton potty cloth diaper baby training pants |
| Material | polyester/cotton |
| Type | adjustable |
| Feature | Eco-Friendly, Waterproof, Other |
| Decoration: | Printed |
| Size | S/M/L |
| Inner | 100% cotton or cotton muslin |
| sample: | 2~3days |






Our advantage is that we not only low price,but we more suited to you.
24Hours online service
Quality control
Small order accept.
Our normal package is each set in a opp bag, one set=1pcof diaper cover+1pc of 3 layer microfiber insert
Also PVC bag PE bag is ok.
Of if you want to do the customized package,we can do for you.

1. Can I mix different colors ?
Yes, you can.
2. Can I change the package ?
Yes, you can.
3. How to place order ?
You just need to email us your order list of the items you want, and we will check the total cost with you, you can pay after you confirmed.
4. Can I get a lower price if I order large quantities of an item ?
Yes, the unit price gets lower as order quantity increases.
5. Can I add or delete items from my order if I change my mind ?
Yes, but you need to tell me asap. If your order has been done in our production line, we cannot change it. It is about 2 days after confirming the order.
6. Can I get the pre-production sample ?
Yes, we will send you pp sample, after you confirm, then we will start production.
7. How can you guarantee the production quality ?
We have our own inspection team to follow the order from start. Fabric inspection--pp sample inspection--production on line inspection--final inspection before shipment. We also accept the third part inspection.
8. What is the lead time ?
Normally 25-35 days. Can negotiate based on order qty and production schedule.
New products from manufacturers at wholesale prices