10 MPa cemented carbide pressure sintering furnace

Share on (60812457790):


Price:

Quantity:


Product Overview

Description


Product Description

 _0007.JPG

Technical parameters

YSL30/30/100-10

YSL50/50/150-10

YSL50/50/180-10

YSL50/50/240-10

Charge batch

100-200Kg

600-800Kg

800-1000Kg

1200-1500Kg

Working space

300×300×1000mm

500×500×1500mm

500×500×1800mm

500×500×2400mm

Designed pressure/maximum working pressure

11MPa/10 MPa

11MPa/10 MPa

11MPa/10 MPa

11MPa/10 MPa

Ultimate vacuum/ pumping speed

 Less than 10Pa , 2Pa/30min

Pressure increasing rate

4 Pa/h

Rated temperature

1600℃

Working temperature (vacuum/pressure)

1550℃/1500℃

360℃ Temperature Uniformity

±6℃

±8℃

±8℃

±10℃

1420℃ Temperature uniformity ( PTCR)

±5℃

±7℃

±7℃

±7℃

Product magnetic force/cobalt magnetic

±0.5 KA/m /±0.25%

±0.5 KA/m

 /±0.25%

±0.5 KA/m

 /±0.25%

±0.7 KA/m

/±0.3%

Cooling speed (full furnace cools from 1400℃ to 80℃ or below)

≤5小时

≤7小时

≤8小时

≤10小时

Pressure difference for differential pressure degreasing box

(Air inflow below 800L/H)

≥500Pa

≥500Pa

≥500Pa

≥500Pa

Temperature control mode/Deviation

Three zones ±2℃

Three zones ±2℃

Three zones ±2℃

Six zones ±2℃

Heating power

360KVA

580KVA

700KVA

750KVA

Total power

400KVA

650KVA

770KVA

820KVA

Wax collecting rate

97%

97%

97%

97%

High-pressure Argon consumption

55m3/h

115m3/h

120m3/h

160m3/h

Cooling water consumption

16m3/h

22m3/h

26m3/h

40m3/h

Emergency water supply

9m3/h

12m3/h

15m3/h

16m3/h

Compressed air pressure

0.48~0.7MPa

0.48~0.7MPa

0.48~0.7MPa

0.48~0.7MPa

Floor space

7.1×6×4m

8.6×7.3×4m

8.6×7.6×4m

9×9×4m

Total weight

25000Kg

41000Kg

45000Kg

50000Kg

 

Company Information2

Company Information6.png 

Packaging & Delivery

.png 

More Product

 

-1_01
-1_06-1_04-1_05
-1_07-1_09-1_10

 

FAQ

Q.Why choose US?
A.1.Over 50 years' history in cemented carbide products research and develop.
    2.Up to date production facilities;
   3.Complete & strictly QC system throughout the manufacturing process.
   4.Lead time as fast as 7-15 days!
   5.OEM & ODM service, professional R&D department is ready to design products to fit your specifications,they can offer the professional advice and CAD drawings(3D) for you!
   6.GB/T1 9001:2008/ISO 9001:2008/ISO14001:2000 certificates.
   7.ZGCC's carbide was recognized by market, it widely used for Chinese big project,such as subway,high speed rail,tunnel,mining and so on.At the same time,many big projects of the South africa,America,European and Austria also choose our carbide.
Q.What is the MOQ ?
A.No MOQ for our existing stock,for special size,MOQ is 5 KGS.
Q.Can I place a mixed order?
A.Sure!
Q.Can I get a lower price if I order large quantities?
A.Yes, big order get big discount.
Q.Can I add or delete items from my order if I change my mind ?
A.Yes, but please advise us within 5 days.
Q.Do you provide samples ? Is it free or extra ?
A.Yes, we will send you sample before mass production, and start production by your approval.Most sample is free,you only need to pay the freight.
Q.When you ship my order?
A.Normally 7-18 days after receiving your payment, but it can be negotiated based on order qty and production schedule.
Q.If I need any products hurry,could you make them fast for me?
A.Yes.If you are hurry,we will make the products as fast as we can and delivery them in the fast shipment.
Q.How can you guarantee the production quality ?
A.Our production is based on ISO9001,we have more than 40 years experience of QC team and strictly quality control system in our production process. At the same time,before sent the products,we will sent the free sample for you to test.
Q.What about the package?
A.It can make as the you need and depend on the products shapes. Generally, we can provide iron drum, carton, wooden case, and bag packages.

Contact Us

.png 


0.2098 s.