13mm roll track and Prefabricated rubber running track

Share on:


Price:
Price in USD:Details

Quantity:


Product Overview

Description


Running Track Athletic Track 


 


The base layer consists of Black Styrene Butadiene Rubber(SBR) granules,bound together  with a specially formulated,  100% s olids  MDI  based  single  component polyurethane,at a thickness of 10mm(3/8inch).


The top layer consists of a specially formulated, colored polyurethane into Ethylene Propylene Dience Monomer(EPDM) which  granules have been embedded before curing for a thickness of 3mm(1/8inch).


 





















NamePrefabricated System Running Track    
Base RequirementCement Concrete or Bituminous Concrete 
Thickness9-13mm
Suitable ScopeEDPM,PU Binder

 


Prefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School SurfacePrefabricated Rubber Running Track Roll  Mat Material for Stadium School Surface


 


 



FAQ


 Q:What is the Production time?

 A:15-25days.


Q:What are the options for the base construction of a running track?

A:Based on asphalt or concrete.

 
Q:What is the life Span for Running track?

A:10-15years.


Q:How many system of Synthetic track surface,what is the best choice?

A: 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.

 

Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project


Sandwich sytem: EPDM broad be handwork,is professional than spray coat,most pouplar in the world market.


Full pour System: Best quality, bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.

 

Prefabricate :Eco-friendly,package by roll, easy for installation,Professional for stadium international games,like Olympic games.

 

 


    Prefabricated Rubber Running Track Roll  Mat Material for Stadium School Surface                       Prefabricated Rubber Running Track Roll  Mat Material for Stadium School Surface           Prefabricated Rubber Running Track Roll  Mat Material for Stadium School Surface


             


              Artificial grass                           Portable event deck                 PP interlock flooring


 


Address:B4-06 2013 Cultural Maker Park ,Lijia Road 108th ,Longgang District ,Shenzhen China 518115


Tel/Fex: +86 0755 28715966


Whatsapp:+86 13824280139


Web:www.flyonsport.com





0.0095 s.