Share on (60822106753):
| Desuman Portable toilet |

| Name | China Portable Toilet Portable Toilet Price Manufactured In Foshan |
| Main structure | Steel structure, sandwich panel |
| Size | customized |
| Door | Sandwich panel door, composite door ,etc. |
| Roof and wall | Sandwich panel |
Floor | PVC, ceramic, etc… |
windows | PVC, aluminum |
Easy assembly | yes |
lifetime | 15-30 years |
Flexible layout | yes |
| Certificate | ISO,SGS,CE |
Featured:
1.Structure is reliable: Light steel structure system is safe and reliable, satisfied modern architecture concept.
2.Easy assembly and disassembly: The house can be assembled and disassembled many times, used repeatedly. It just needs simple tools to assemble. Each worker can assemble 20~30 square meters every day. 6 workers can finish 300sqm prefab house in 2 days.
3.Beautiful decoration: The prefab house is beautiful and grace, have bright and bland colour, flat and neat board, with good decoration effect.
4.Flexible layout: Door and windows can be assembled in any positions; partition wall panel can be assembled in any transverse axes sites. Stair is assembled in outside.
5.Using life: All the light steel structures have antisepsis-spraying treatment. The normal using age is above 15 years.
6.Environmental protection and economy: Prefab house design is reasonable, easy to assemble and disassemble, used circularly, low wastage, without building rubbish. Average using cost is less than other kinds of building annually.
If this product is not your cup of tea,
Nerver mind, Please Click Here!
to send a message to us, we have
someone who tell Solutions Products
More Product
| Light steel villa | Prefab house | Steel Structure |
| Sandwich Panels | Container House | Guard Room |
Our Company:
Foshan Desuman Building Materials Technology Co.,ltd was established in 2013. We are located in Foshan city, Guangdong Province, China; Our factory covers about ten thousand square meters, with over one hundred skilled workers. We are engaged in designing, manufacturing, building and marketing for all and of prefabricated houses and sandwich panels. We have now succeeded in passing ISO9001:2008 Enterprise Quality Management Authentication. We sincerely hope to join hands with our clients to create a better future in principle of win-win cooperation!
| Packing | 1. steel structure: plastic film packing 2. panel: plastic film & cartoon packing 3. hardware: cartoon box packing 4. loaded into 40'HQ |
| Payment terms | 30% deposit and 70% before shipment, T/T,L/C, western union are all available. |
| Delivery time | Shipped in 15 days after payment |
New products from manufacturers at wholesale prices