Mining mineral vibrating grizzly screen feeder

Share on (60824362449):


Price:

Quantity:


Product Overview

Description



Product Description


Mining mineral vibrating grizzly screen feeder
Mining mineral vibrating grizzly screen feeder in the work process can make the massive,granular materials from the storage bin in uniform,timing,continuously fed into feeding device,in the sand production line,it can feed materials to crushing machine continuously and uniform,and screening rough materials,widely used in metallurgy,mining,mineral processing,building materials,chemical industry,abrasive and other industries crushing and screening combination equipment.




Detailed Images


Model
Trough Size
(mm)
Max Feeding
(mm)
Capacity
(t/h)
REV
(r/min)
Power
(kw)
GZD 800x1800
1800×800
300
30-80
970
6-1.5×2
GZD 1200x2000
2000×1200
300
80-500
970
6-2.2×2
GZD 850x3000
3000×900
300
40-100
970
6-2.2×2
GZD 960x3800
3800×960
500
90-200
710
6-11
GZD 1100x4200
4200×1100
580
150-350
710
6-15
GZD 1100x4900
4900×1100
580
180-380
780
6-15
GZD 1300x4900
4900×1300
750
250-450
780
6-22




Feature:
1. It vibrates calmly, works reliably with a long life-span.
2. Its stimulating vibrancy power can be adjusted, while the flux can be changed and controlled.
3. It is convenient and stable to adjust.
Feature:
4. Vibrating feeder's vibrating electrical engine is stimulating vibrancy fountain, with low noise, low cost of electricity, and good adjusting capability, without rushing phenomenon.

Feature:
5. Its structure is simple and works stably, and easy to adjust and install.
6. It can avoid powder and dust pollution when using the closed structural body.


Company Profile


Henan Seasun Heavy Industry Machinery Co., Ltd. is a large group enterprise mainly manufacturing heavy mining machinery, and integrate scientific research, production and sale as one. Seasun company is located in Mazhai industrial park, Erqi District.
There are more than 200 sets of various large and mediumsized machining, rivet weld and assembly equipment. Among more than 960 staff, there are over 120 middle and senior title management staff, engineers and technicians. Our company has introduced advanced technology from America, Germany, Japan, Australia etc., and established the international advanced production line and firstclass modern detection and also have sand stone machine, grinding machine and beneficiation equipment research labs. With scientific management method.


Packing & Delivery


Packaging Details:
1.International export standard packing of xxx
2.Small parts are woodened box package
3.Main engine nude,container,or customer'requirement


Port:Qingdao or the nearest port

Lead Time :Shipped in 20 days after payment


Our Service


1.Skilled technicians and experienced after-sales service team provide professional services .
2.Please log in to //www.seasunmachine.com
to communicate with us anytime,anywhere.
3.Apowerful internet technology platform provides you with new product information and technical services.
4.Our team of engineers for solutiongs of products.
5.Stock of spare parts.
6.Strict inspection before delivery.


Pre-sale
(1)Instruct customers to choose scientific and reasonable equipment models.
(2)Send engineering and technical personnel to the site to plan the site, design process and plan for the user.
(3)The products can be designed and manufactured according to the special requirements of customers.


For sale

(1)Products will be strictly inspected before loading

(2)Shipping delivery will be based on the contract


After sale
(1)Sand professional afer-sale service technician to customer site for installation.
(2)Be responsible for equipment adjustment and trial operation.
(3)Provide customer training program
(4)Regular afer-sales service tracks the problems encountered in the customer's production process.Our company's service personnel guarantee a clear solution within 24 hours.


Our Certificate




FAQ


FAQ
1.Are you a manufacture or a trader?
We are manufacture for this machine;
we can offer you the high quality machine and heart and soul service;

2.How many sets put into a 20'GP?
2-3 sets in disassembling;
3.Will you arrange the technicians to install and train our workers?
Yes, we will send 1-2 persons accordingly.


Recommend Products




0.1993 s.