Korean Design Good Quality Stand Compressor Cooling Hot Cold Water Dispenser for Home

Share on (60833097164):


Price:94,00 $ - 98,00 $

Quantity:


Product Overview

Description


Product Description
Model Number
 IP-8201F
Packing Size
 29.5*52*120cm
Heating Power/Capacity
420W / 5L/H,85-95°C
Color 
White and Black

Cooling Power/Capacity 

90W / 2L/H,5-10°C ( compressor )

Related Voltage/Frequence
110-127V ~50/60Hz
220-240V ~50/60Hz

Body materials
 1 mm Galvanized sheet iron side panel

Warranty
Compressor 3 years
100% new ABS plastic 
Plastic parts 1 year
Compressor Brand
 Asbeila

Water Tank Type

Stretched water tank
Water Tank Material
Standard SS304

Connection Type

Soft connection ( food grade silicone tube)

Tank Volume 
Hot 1.5 L
 Cold 3.0 L
Packing Material
Standard export color box 
Brand
OEM
Loading quantity
20FT container
160 pcs
40HQ container
350 pcs
MOQ
50pcs
Payment
Payment method
100%T/T (30% deposit and 70% balance should be paid before container loading)/ L/C
Detailed Images
Packing & Delivery
Packaging: standard cardboard box with foam 
Delivery: 25-30 days after deposit received
FAQ

Q: What is the difference between Electronic cooling system and Compressor cooling system?
A: 1. The compressor type is cooled by refrigerant R304a, Cooling Power: 90W, Cooling Temperature: 6-10°C, Cooling capacity: 2L/H
2. The electronic type is cooled by electronic semiconductor, Cooling Power: 75W, Cooling Temperature: ≤15°C, Cooling capacity: 0.75L/H
So, compressor cooling type is faster, colder and more stable than electronic cooling type.

Q: What is the production time?
A: 25-30 days after deposit received.

Q: Can I put my own Logo on machine?
A: Yes, we are specializing in OEM order. Logo, carton design, color are all can be customizable.

Q: What is MOQ?
A: 120pcs for compressor cooling system, 238pcs for electronic cooling system.

Q: What is the guarantee term for product?
A: Compressor 3 years, Plastic parts 1 year and offer 1% of total order quantity spare parts for FREE CHARGE!

Q: What is the payment term?
A: 30-40% deposit and balance should be paid before container load.

About Us

0.1977 s.