Excellent Waterproof Best Sealing One Component Polyurethane Waterproof Coating For Ventilated Basement Waterproofing (60835517711)

Share on:


Price:$1.45 - $1.75
Price in USD:Details

Quantity:


Product Overview

Description


Product Description

Excellent Waterproof Best Sealing One Component Polyurethane Waterproof Coating For Ventilated Basement Waterproofing 



Key Features

1.Eco-friendly Waterproof Coating
2.One component polyurethane with lasting elastic waterproof material
3.Odorless, Eco-friendly, No Harm to the Builder
4.Excellent Waterproof, Best Sealing, Bright Color
5.Resistant to Oil, Acid, Alkali ,Puncture, Chemical Corrosion
6.Single Component, Self-leveling, Easy to Use, Convenient Operation
7.500%+ Elongation, Super-bonding without Crack
8.Resistance to Tear, Shifting, Settlement Joint

Typical Applications

1. Waterproofing and moisture proofing for kitchen, bathroom, balcony, roof and so on.
2. Anti-seepage of reservoir, water tower, water tank, swimming pool, bath, fountain pool, sewage treatment pool and drainage irrigation channel.
3. Leak-proofing and anti-corrosion for ventilated basement, underground tunnel, deep well and underground pipe and so on.
4. Bonding and moisture proofing of all kinds of tiles, marble, wood, asbestos and so on.

Technical Data Table


PROPERTY
PU110
Color
Black,White,Blue,Grey(Customized )
Density (g/cm³)
1.35±0.1
Tack Free Time (Hr)
8
Tensile Strength (Mpa)
>2
Curing Speed (mm/24h)
3 ~ 5
Elongation at Break (%)
>500
Solid Content (%)
>85
Operation Temperature ( ℃)
5-35 ℃
Service Temperature ( ℃)
-40~+80 ℃
9Shelf Life (Month)
9

Operation:

                                                                                        First Step
Brushing the part like corner, tubes root, then symmetrical scraping. The thickness of the coating is generally 0.5mm. (Avoid bubble). When operation,It should be considered about the size, shape and environment of the construction area.
                                                                                        Second Step
Symmetrical scraping when the coating is completely solidified (about 12 hours later). The thickness of the coating should be 0.7mm, and the direction of smearing should be perpendicular to the first time. The specific operation is the same as the first step.
                                                                                       Third Step
Symmetrical scraping when the coating is completely solidified (about 12 hours later). The direction of smearing should be perpendicular to the second time. The specific operation is the same as the first step.The operation times depends on the design thickness, the overall thickness is 2.0-2.2mm

Packing & Delivery

Package Details:


1Kg Bucket /5Kg Bucket / 20Kg Bucket / 25Kg Bucket / 230kg Bucket are available
Shipping:
1. By express(FEDEX)
2. By sea (FCL/LCL)
3. By Railway

Our Company

As the most professional adhesive manufacture in Shanghai,chian for more than 15 years,our main product series now is polyurethane,silicone and epoxy adheive sealant.Mainly used for automobile,electronic and industry.


Our Service
Certifications
FAQ

Q: Delivery time?
A: Normally 3-7 days after receive your payment .
Q: Can I get samples?
A:Yes , 1KG Tin /5kg Bucket samples are available .
Q: What is your MOQ?
A: Our MOQ is 1000kg for black /White /Grey / Blue color, 5000kg for customized color
Q: Can you do OEM lable for the products?
A: YES, We can

Any more questions, please contact us anytime! 


60835517711
0.0104 s.