Автоматическая линия по производству мокрых цветочных поролонов по заводской цене

Share on (60840505395):


Price:36 000,00 $

Quantity:


Product Overview

Description


auto wet floral foam production line factory price



Product Description


 


Product Purpose: Wet Floral foam, Dry Floral Foam.


Environmental protection: no sewage, no waste emissions;


Phenolic Resin Equipment


(1)Reactor: Model 500L,1000L,1500L,2000L ,according customer quantity require provide suitable design.


(2)Material: With jacket design, SS304,Q235


(3)Application: Various resin, adhesive, paint, chemical.


 


Resin high speed mixer


High speed mixing, with mixing tank


(2)   material: 304 L, Q235


 


Foaming Equipment


(1) material: 304 L, Q235
(2) energy saving, high efficiency, environmental protection equipment
(3) after installation equipment specification: 5.8 M * 2.6 M * 3.5 M


 


Vertical cutting machine


Description: (1) the peel and cut different shape of the bubble specifications;
(4) after installation equipment specification: 3.6 M * 2.8 M * 2.4 M wide
(5) the total power rating: 1.5 KW


 


horizontal cutting machine
(1) 8 cm foam cutting specifications;
(2) after the installation equipment specification: 5.6 M * 2.8 M * 2.4 M


 flower mud production line.jpg


 


 


 





Packaging & Shipping


 


Packed by  standard export package.


Detail shipping way& term can be discussed.


Delivery time about 40-45 days after down payment


 





Our Services


 


1.We can fully as customer requirement design and produce the machine



 


2.We have professional team to provide  pre-sales and after-sales service for you.


 


3,Welcome to equiry the machine,we promise will give the feedback with 24hours.


 





Company Information


 


Our company have rich experience for chemical machines,we can make the machines as customers' detail requirement,or we can make a best  scheme for customer reference.


 


Our company is closed to Qingdao airport,we can pick up you very expediently to visit our company.


 





FAQ



1. How many workers would be required to run the full line?
The line need about 7-8 people to run.



2. About installation & first run the line, how you cooperate?
1) We seller will send two technicians to teach the technology in your factory for 15-20 days until the buyer learn it well.
2) If there is any problem of the machine or technology in the future, we seller will send the technician to help the buyer solve all these problem. Also you can talk about your question on chat way, we can try my best to help you solve your question.



3. Can I get free floral foam samples?
YES. We would like to send several samples for your reference if you could afford freight.


 





Contact


 Alvin.png




0.2113 s.