Share on:
1.Brand: ZHSU 2.Nitride depth:0.5~0.8mm
3.Bimetallic depth:0.8mm~3mm 4.For what machine: Injection machine
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
\t | \t |
Blanking→Rough Machining→Quenching & Tempering →Semi Finishing Machining→Finish Machining→Nitriding or Bimetallic
Treatment→Detecting→Finished Product →Debugging After Treatment
REFERENCE ONLY FOR SINGLE SCREW AND BARREL , PLEASE CONTACT ME FOR DETAILS.
① Strong abration resistance, good for the 30% glass fiber and reworked materials.
②Super hard alloy of high density, low porosity and high hardness.
③ Uniformity heating of power and low strength pressure.
④ . With high corrosion resistance, high wear resistance and high temperature resistance properties.
① 2-5mm-thick alloy coat on the barrel inner wall
② Excellent corroion resistance, abrasion resistance and high working temperatre.
③ Useful service life is greatly improved Bimetallic has more obvious ④ Able to process special plastic: engineering plastics, fluorine plastics, PPO, and tec.
The Processing of bimetallic screw and barrel
Semi finishing of the Barrel
Packing Details : Customized wooden cases (standard export packaging).
Delivery Details : 3-30 days after order of Solid bicycle tire tubes
A: We are factory.
A: Generally it is 5 days if the goods are in stock and 25-30 days after the confirmation of the order.
A: Payment<=1000USD, 100% in advance. Payment ≥1000USD, 30% T/T in advance ,70 %balance before shippment.
If you have another question, pls feel free to contact us as below: