XMWY Slab Formwork for Casting Concrete, Replace Table Form/doka formwork

Share on (615413607):


Price:

Quantity:


Product Overview

Description


slab formwork for concrete,replace table form/doka formwork

 

 

Related products:

formwork system, scaffold props,shuttering materials, base jack, plywood supporting,post shore,  shoring props, steel pipe,galvanized scaffold plank,formwork accessories scaffolding coupler, double scaffold clamp, scaffold pipe clamp

 

 

Product Description

 ceiling/roof/floor slab formwork

 

 

1. Model:   Slab Formwork (pure steel, electrophoretic painted)

 

2. Application:  used together with plywood for concrete form. 

 

3. Components
-- Main Beamlength adjustable between 1.17m and 4.39m;
-- Sub Beam: normal size in L1.15m 
   Material of Beam: cold rolled steel

 

-- Vertical prop: OD48mm*THK 3.0mm*L 2.55m(normal)
                        easily connected to reach any required height

-- Horizontal prop: OD48mm*THK 2.75mm*L 1.22m(normal) 


-- 'U'-Screw: OD38mm*THK 3.0mm*L 0.6m(normal) 
   Material: seamless pipe, threaded

4. Load Capacity:    3500kg per s.q.m.(whole system) 


5. Installation:   A group of 4 workers can erect 300s.q.m in 8 hours.

 

6. Project Photos:

 slab formwork

 ---

 SUB BEAM_

7. Design 

We can design for each specific project according to your structural drawings.

We also have standard match that allow for more flexible uses.

 

QQ20130508090217.jpg

 

7. Certificates & Factory

zhengshu  750

EXHIBITION

 

 

 

 

Any further questions, pls feel free to contact with us.

It'd be pleasure to hear from your needs.



0.1016 s.