Share on (62001900241):
RTKZ00 bogies is mainly designed for 1435mm gauge passenger coach. The max. axle load is 16t, operating speed(max.) is 160km/h. This bogie is mainly composed of frame, wheelset, primary suspension system,secondary suspension system, hand braking system, braking system, traction device and auxilary device and etc. The bogie frame adopt H type welding structure, the side beam is U type structure. The main material of bogie frame is S355J2+N. The Wheels adopt 890mm wheel. The wheel thread is of wear type according to UIC standards.The manufacture of axles and wheelsets meets the requirements of EN13260 and EN13261 standards. The bearings on the bogie adopt SKF centripetal short cylindrical roller bearings. Each bogie is equipped with a grounding device at one end of the axle. The vertical suspension and the inside and outside double coil springs are adopted in the primary suspension. The axle box positioning adopts elastic joint rotary arm positioning device. Bolster spring device for a group of the single coil spring locating in the spring seat of the frame.
Bolster spring device for a group of the single coil spring locating in the spring seat of the frame, the bolster is placed on the bolster spring, and the body is directly supported on the two coil springs by the bolster. There are two vertical hydraulic vibration damper and a transverse vibration damper between the bolster and the frame. The basic braking longitudinal beam of the bogie frame and reduces the longitudinal impact between the body and the bogie frame.
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
| \t | \t |
Package: 4 sets/20GP, nude packed in steel frames;
Delivery: within 120 days after order confirmed
| \t | |||
| \t | \t | \t | \t |
| \t | \t | \t | \t |
| \t | \t | ||
Railteco Group(stock code:833120) was established in the year 2003, mainly engaged in design, manufacture and maintenance of railway wagons, vehicle parts, passenger coach interirors and railway equipment.
A: We are manufacturer, with design capability. We have two sites: Anhui Railteco forging railway axles and assembly maintenance equipment, Jiangsu Railteco machining wheels&axles, welding wagon frames, assembly workshop.
A: For bogies, from 90 days to 120 days.
A: Yes, we have design ability, and we have an expert technology team for railway equipment.
A: T/T or L/C, we need at least 30% deposit, and balance before shipping.
If you have another question, pls feel free to contact us as below:
New products from manufacturers at wholesale prices