pvc panel Zimbabwe

Share on (62005188748):


Price:RUB 113.73

Quantity:


Product Overview

Description

Product Details

PVC sheet for ceilings

The PVC ceiling widely used for indoor decorative, such as Hotels, commercial buildings, hospitals, schools, cooking rooms, washing rooms etc.

The features of PVC sheet for ceilings

1) Easily assembly and clean
2) Without gap when concatenated
3) High intensity, corrode-resisting, aging-resisting
4) Due to PVC's high chemical stability,our panels can be used more than 10 years
5) Prevent fire,water,antibiotic.
6) Harmless to human being and eco-friendly
7) For Ceiling and Wall decoration
8) Accessories(corners) accompany perfectly

Specification

Width: 20, 25, 30, 40, 60cm
Thickness: 6mm to 12mm
Length: 5.85m for 20GP container, 5.95m for 40HQ container or according to customers' requirement
Color: more than 300 colors meet your needs
according to clients' requirements
Design: Groove, Flat
PVC ratio: 40-50% according to clients' requirements

Product show
Why Choose Us

About Us

Experienced building material manufacturer supplier

Service

Stable product quality , in time supply, good faith management and your private products consultant

Equipment & Technology

Good quality & best price

Installation

Installation

1. Select the first board and fix it onto the wooden framework.
2. Use a special designed connector to fasten the next board.
3. Fix the next board onto the wooden framework.
4. Continue this step until you hit the end of the ceiling.

10 easy steps to a complete makeover:

Step 1: Secure a corner support rail with nails, stapler guns, screws, liquid nails, etc so that it is securely fastened
Step 2: Fasten the top and bottom support rails.
Step 3: Cut the panels to size using a handsaw, electric saw or sharp blade.
Step 4: Slide the panel in at the top support rail and ease it into the bottom support rail.
Step 5: Make sure the first panel is attached securely to the corner.
Step 6: Take the next panel and repeat Step 4.
Step 7: Slide the panel to the previous panel making sure the tongue locks securely with the groove.
Step 8: Repeat Step 6 and Step 7 until you reach the end.
Step 9: If required, cut off any access to fit.
Step 10: Install a support rail to complete the installation.

0.0801 s.