Manufacturer Price Sandwich Panel Foam Making Machine Production Line

Share on (62008118689):


Price:$25,000.00 - $26,000.00

Quantity:


Product Overview

Description


Manufacturer Price Sandwich Panel Foam Making Machine Production Line



Main Specification of PU Sandwich Panel Production Line:


 


1) Speed of product line: maximal speed: 6-7/min (approx 2880-3360 m2 per day)             (frequency conversion to adjust speed)


2) The dimension the product line: about 120 mX18mX3.5m


3) Total power of the product line: about 400 KW(Include the electricity heating 200kw)


4) Single shift can produce 820,000-960,000 m2 (the line can operate 24 hours per day)


5) 2 component Chinese PU foaming machine


6) The final panel width:1000mm


7) The thickness of the steel sheet:0.3-0.7mm


8) Core materials: PU


9) Density of the PU panel:      40-45kg/m3.


10) The length of the double belt:  24m


 


1. Hydraulic Un-coiler:













































Motor Power:  3KW
Hydraulic Power                               202kw
Raw material:Color steel sheet, Aluminum sheet
Inner diameter of coil:φ500mm-φ600mm
Out diameter of coil:φ1200mm
Weight of coil:10T
Thickness of sheet:0.3-0.7mm
Width of  sheet:1250mm
Speed of  uncoil:1.5-12m/min
Hydraulic pressure:  6.3Mpa

 


2. Coil car:





















Hydraulic cylinder lift stroke:up panel 0.5m,down panel 0.5m
Coil car stroke:0.5m
Pressure of hydraulic system:6.3Mp
Tightening mechanism                  Magnetic brake



1.jpg

2.jpg

6.jpg

_04

 


Product Category


1.jpg















Production Flow


9.jpg 





Company Information

2.jpg

Company Verified

 

1_06.jpg

3.jpg



Sale Terms



  • Payment Method


30% as deposit ,balance payment after inspection while before delivery. 



  • Production Period       


30 days after the 30% deposit.



  • Packing Method


Nude packing in the 40 feet container ,fixed well with oil rope, control cabinet and all the accessories with waterproof.



  • After-sell Service


In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.



  • Installation


 If installation is needed, the seller will dispatch a technician to the buyer’s factory abroad to assist regulating the machine with charge free. The buyer should assist the seller to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the following preparation before arrival of technicians.


 Position the machine in the buyer’s factory.


 Prepare necessary electric wiring.


 Prepare material of trial running.


 Provide labors for assistance and installation during installation.





Packaging & Shipping


4.jpg




FAQ


Q1. What's your payment terms and delivery time?
A1: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms are acceptable.


After we get down payment, we will arrange production. About 30-45 days for delivery.


Q2. Do you have after-sales support?
A2: Yes, we are happy to provide advice and we also have skilled technicians available across the world. 


Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers specifications, using top brand components.
Q4. What will you do if the machine is broken?
A4: We provide 18 months free warranty and free technical support for the whole life of any machine.
If the broken parts can't repair, we can send the new parts
 replace the broken parts freely, but you need pay the express cost by yourself. If it is beyond the warranty period, we can negotiate to solve the problem, and we supply the technical support for the whole life of the equipment.


Q5. Can you be responsible for transport?
A5: Yes, please tell me the destination port or address. we have rich experience in transporting.


Q6. How to visit your company?
A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour).
       2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.


_04


 


_03


 




0.1992 s.