Hot Sale Railway Rubber/HDPE Rail Pad For Railrpad sleepers

Share on (62014843830):


Price:$1.80 - $2.00

Quantity:


Product Overview

Description



Product Description


Hot Sale Railway Rubber/HDPE Rail Pad For Railrpad sleepers

 Rail pads are widely used to reduce fatigue cracking of the concrete ties caused by the vibration of passing train. When the train's wheel is over the pad, the latter's stiffness must be high to prevent large movements which can result in the metal spring becoming loose





Material: 
Rubber 
HDPE 
EVA 
Technical Parameter 
Stiffness: 90-130KN
density: 0.95-0.98g/cm3
density: 0.95-0.98g/cm3
Tensile strength: ≥12.5Mpa
Tensile strength : ≥19Mpa
Tensile strength:≥15Mpa
Elongation: ≥250%
Elongation: ≥80%
Elongation: >500%
Melting Point:72-80 ℃
Melting point: 170-190°C
Melting point: 170-190°C
Electronic Resistance: ≥ 106 Ω
Hardness: ≥98A
Hardness: ≥90A


Detailed Images




Rubber Rail Elastic Pad





                                                                                 Rail Rubber Grooved Pad





  Rail Sleeper Pad Railway Track





Our Company


Anyang Rarlong Machinery Co., Ltd is located in Anyang of China.Our company was founded in 1996, specialized in manufacturing and supplying various types of section steel,wheel assembly,railway fasteners and bailey bridge components. Our experienced research and develop team work hand in hand with out dynamic sales department and technical testing teams to ensure an outstanding product delivered on time, every time. 





Quality Inspection


Our quality control management adopts highly advanced equipment and latest technology, and had obtained the certifications of ISO9001 and ISO 16949 quality system, ISO14001 environmental management system, GB/T28001 occupational health and safety management system.





FAQ


1.Q:Why choose us?

A : Our company has steel rolling mills, can be customized different size of the railway fasteners, which had passed the review of China Railway Product Certification Center and CRCC certificate

2. Q: How do quote on Railway fasteners?

A: Please kindly send us the drawing of your product. Details below should be included,Dimension (Tolerance) , Materials  ,Surface finish  and  Quantity

3. Q: We need the delivery time.

A: It depends on whether the mould available. If with available mould, we can start to produce any time with 40-ton daily capacity. If without available mould, it takes 10 days to develop the mould after receiving prepayment

4. Q: What is the MOQ?


A: 20'' container in general, depending on whether enough stocks available for small quantity; customized products accepted.

5. Q: How long will it be the quotation valid?

A: The validity is 15 days in general, but also depends on the quantity and special conditions. It will be shown in every quotation.



0.0807 s.