Design hotel kitchen construction chile steel structure building in Albania

Share on (62015587536):


Price:

Quantity:


Product Overview

Description



Project Show




QQ20190218133558


 


QQ20190218133635


 


QQ20190218133650


 


 


Steel Structure Building Description














































main steel frame


H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe


Secondary frame 


hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc.


Roof panel 


EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or steel sheet


Wall panel 


Sandwich Panel or Corrugated Steel Sheet


Tie Rod


Circular Steel Tube

  Brace  Round Bar

Knee Brace


Angle Steel


Roof Gutter


Color Steel Sheet


Drawing


We can make the design and quotation according to your require or your drawing


Certification


I-S-O,C-E.


 





Factory Live




design hotel kitchen


design hotel kitchen 


Quality is the guarantee of our long-term survival.With us, you can quickly build your blueprint!







Certifications




design hotel kitchen


 






Transaction records




design hotel kitchen


At present, our products have been exported to more than 70 countries in the world, and have been widely recognized.







Recent Projects




design hotel kitchen


design hotel kitchen 


 


design hotel kitchen


Any problems, please click here to contact us.


 







Packaging & Shipping




design hotel kitchen


Fixed packing, loading, transportation, unloading the matters needing attention:


(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the


rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.


(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile


up securely, and to increase the necessary binding component loosening, prevent the loss.


(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.


(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.


(5) The member to the construction site, timely organization of unloading, stacking area.


(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.







Materials department



  design hotel kitchen




0.2049 s.