Share on (62016920528):
TAIR CHU manufactures the tableware in Taiwan. In our hearts, the cutlery is important that it is the bridge between the food and our mouth, so to respond the market demand and improve quality control, TAIR CHU has been certificated with ISO 22000 and HACCP.
Q1: How do I pick the right cutlery?
A1: Cutlery with the length less than 15cm usually used for take-out meal with small boxes, like desserts or fruits. Long cutlery can be used in picnic, and banquets.
Q2: What is the differences between PP and PS cutlery?
A2: PS cutlery usually has high stiffness but fragile, it’s cold food friendly cutlery. PP cutlery has high impact resistance and less stiffness, it’s hot food friendly cutlery.
Q3: What is PLA or CPLA cutlery?
A3: Both of them are eco-friendly, 100% decomposable and biodegradable. Also, they are similar as PS cutlery, having high stiffness. But CPLA cutlery is hot food friendly.
Q4: Is PS or PP cutlery decomposable or biodegradable?
A4: PS and PP cutlery are recyclable, decomposable and biodegradable.
Q5: Can I order small quantity as the trial order?
A5: Yes, we accept small order of our existing cutlery.
Q6: Can I have the cutlery with my own embossment logo?
A6: Yes, we have strong experience in helping customers fulfill their design. We build around 30-40 different products for our customers every year.
Q7: Can I have logo printed on the existing cutlery?
A7: It is not recommended to print a logo on the cutlery because of the concern of the contamination and high cost. Instead, a box is a more proper place to print the logo.
Q8: Is it expensive to customized cutlery?
A8: We can build the cutlery based on customers’ demand and budget to find the best solution to satisfy customers.
Q9: How do I start the customized project?
A9: We accept 3D design drawings, hand drawings or referral. After fully understanding your idea, we can advise the length, usage, and design of your cutlery.
Q10: What’s the lead time for the customized project?
A10: In general, it will take 7-10 days to design the new cutlery and take another 30-40 days to build the tooling. If you need the prototype before building the tooling, it will need 5 more days.
New products from manufacturers at wholesale prices