Share on:
Animal Carcass Incinerator
Function & application
It is an ideal choice for waste treatment of animal carcass, hotels and various areas.
1. The burned gasification technology, applied to burn syringe, bit containers and the medical equipment and all kinds of waste materials, paper bandages and absorbent cotton, all kinds of medical dirt and hospitals, medical institutions ruled out all kinds of wastes.
2. Three-dimensional structure, small volume, cover an area of an area small, compact structure, not high demand for supporting facilities.
3. The airline engine combustion method, which cut into the high temperature flue gas to burn room and cut the combustion air to enter etc, make the flue gas combustion way in burn indoor can burn full again, and rotating airflow to smoke dust removal.
4. The gasification method, the burning of medical waste incineration process won't produce in melt piece of and sintering problem. The waste generated in the every day can be a burning treatment.
5. Use of gasification burned, mixed burn, burn processing technique, make smoke exhaust smoke and dust content such as dioxin content is lower than the national discharge standard.
6. Adopt totally closed operation. The door, burned out dust doors are zimu mouth forms, the seal structure, with the outside world, burn completely isolated form negative pressure combustion, suitable for dealing with infectious medical waste, avoid secondary pollution.
The machine is used for the following:
1). Gasified pyrolysis incineration is used for burning many kinds of waste.
2). Such as medical waste, slaughtering house waste, chemical waste, printing waste, etc.
Feature & advantage
1) Gasified pyrolysis incineration is used for burning many kinds of waste.
2) Waste can be burned once everyday by gasified incineration.
3) Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust, dioxin etc.
4) Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution.
Technical specification
Model |
Xfs-30 |
Xfs-50 |
Xfs-150 |
Xfs-300 |
Xfs-500 |
Burning Capacity |
20-30kg/time (3-6tims/day) |
30-50kg/time (3-6tims/day) |
100-150kg/time (3-6tims/day) |
200-300kg/time (3-6tims/day) |
300-400kg/time (3-6tims/day) |
Incinerator Size m (L*H*W) |
1.45*0.9*1.75 |
1.8 *1.15*3 |
2*1.4*3.5 |
2.2*1.4*3.8 |
3*2*4.8 |
Imputing Mouth With (mm) |
480*600 |
620*800 |
760*860 |
900*1100 |
1080*1280 |
Chimney External Diameter (mm) |
280 |
280 |
300 |
400 |
460 |
Draught Fan (Kw) |
0.37 |
0.37 |
0.5 |
1.1 |
1.1 |
Combusion Improver Device |
0.11kw Oil consumption 4-6kg/h |
0.11kw Oil consumption 4-10kg/h |
0.11kw Oil consumption 6-12kg/h |
0.22kw Oil consumption 7-14kg/h |
0.22kw Oil consumption 7-16kg/h |
Re-Burning Device |
0.11kw Oil consumption 4-6kg/h |
0.11kw Oil consumption 4-10kg/h |
0.22kw Oil consumption 7-14kg/h |
0.37kw Oil consumption 10-20kg/h |
0.37kw Oil consumption 15-26kg/h |
Voltage |
380v/220v |
380v/220v |
380v/220v |
380v/220v |
380v/220v |
01. We are a manufacturer and we have import and export rights.
02. We produce wonderful environmental protection machines and solutions, pulp and paper making machines and solutions as well as tissue paper converting machinery and solutions,
03. Our main manufacturing facility which spans nearly 30,000m2.
04. We have achieved a total of 32 patents over the past few years.
05. Each year the output value of our products can reach up to 150 million RMB, to domestic and overseas.
06. We are in very close proximity to a very famous port city – Qingdao in northern China, and this location provides us with a plethora of logistics advantages, including: easy and cost effective transport by both air and sea, also.
01. Detailed installation manual and maintenance guideline are provided with the equipment.
02. Technical training and site-commissioning are available for you.
03.Any equipment issue, we will stand by. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
01. How to buy your idea products?
A: You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
02. How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
03. What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
04. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
05. How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings, PainBow, etc. What's more, we paint strictly according to the standard process.
06. How do you manufacture your equipment ?
A: Our machining technology includes laser/plasma cutting, automatic welding, CNC cutting and bending.
07. How to install after the equipment arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.