360mm tire rubber hose soft flexible inflate high pressure tube pipe with clamp air chuck

Share on:


Price:RUB 83.40
Price in USD:Details

Quantity:


Product Overview

Description

 

related sales
Hot Sales Products
 
HTB10Q85aUzrK1RjSspmq6AOdFXal.jpg80204.jpg00204.jpg519e8Wall-hung-Tire-Tyre-Inflator-Pre-set.jpg_250x25090205.jpgQ02.jpg 

Tire air soft flexible rubber hose pipe with lock-on air chuck for autos 

 

C01_02.jpgWhy choose us?

 

 

1)Specialized Tire/Tyre air pressure inflation manufacturer Established in 2006,Customize for lots of famous brand and trading company for years.

 

 

Our Service

1. OEM Manufacturing welcome: Product, Package, pressure gauge invention...
2. free Sample.

3.1 year guarantee.
4. We will reply you for your inquiry in 24hours.working day:7*24.
5. after delivery, we will track the products for you once every two days, until you get the products.

 

FAQ

Q1.Are you a manufacturer or trading company?

A:Established in 2006, Zhuhai SeaPeng Automobile Testing Equipment Co., LTD. is a high-tech enterprise specialized in manufacturing, researching and sales of Tire inflator with Pressure Gauge and AIR inflation system. Headquartered at Zhuhai, China, SeaPeng has dedicated itself in the manufacturing of air inflation over the last 13 year. 

 

Q2.Where is your factory located ?  How can I visit there ?    

A: With an ISO90001 certified factory located in TangJia wan,ZhuHai city , Guang dong Province , P.R. China . It takes about 1 hour from Guang zhou railway station by train.  Welcome to visit us. 

 

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral double blister card,

white boxes and high-class cartons. If you have legally registered patent, 
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q3. What is your terms of delivery
A: EXW, FOB, CFR, CIF

Q4. How about your delivery time?
A: Generally, it will take 3 to 60 days after receiving your advance payment. To specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

0.0328 s.