Formwork construction hardware Galvanized scaffolding props jack base

Share on (62036326371):


Price:$0.50 - $1.00

Quantity:


Product Overview

Description


Formwork construction hardware Galvanized scaffolding props jack base



Product Description


Our products are produced with more attention on the following steps:


1,Material,which is the most important part,we have the material testing report for each customer .


2,Producing process :when we start mass production,we will test the first few for record,our QC will take some for testing now and then during mass production.


3,Packaging:we have self testing system before final pakaging,so the goods that are packed are 100% qualified.





Product Show


 1.jpg


 


 


baseJack and jack nut (6).jpgbaseJack and jack nut (1).jpg


6.jpg9.jpg





Workshop


 4.jpg





FAQ



How do we develop new products ?

(1)Get order and deposit--
(2)ensure the schedule with production department-
(3)Design the drawing
(4)Make the mold and produce sample
(5)Send out the sample with initial inspection report.


What type of products you are specialized in?

1. We are specialized manufacturer for construction Precast Concrete Accessories, such as Lifting  systems , Coil & Ferrule Inserts and Forging Parts etc.
2. Main products comprise lifting anchors, lifting sockets, ring clutchs, lifting clutchs,erection anchors, plate anchors, coil&ferrule inserts and other precast accessories.

What kind of currency we take?

We can deal in USD / Euro currency , RMB payment is perferable.

What is your Quality Guarantee?

1. High quanlity steel material from famous steel group.
2. All of the products was qualified before shipping.


What kind of trade term we take ?

1. FOB and CIF(Carriage, Insurance & Freight) are the most trade term we take ,The CIF includes the freight cost to your Designated sea port.
2. We can provide clearance of goods which needs to be handled by a local freight forwarder.
    All local costs and taxes are the responsibility of the buyer. We are happy to offer advisement on shipping if required.we can help buyer to cleare goods in destination port .


How about the delivery time?

The delivery time is depend on the products and the quantity. But generally, the delivery time for a  container is about one month. 




0.2129 s.