Kawasak двойные лопасти шпалерные ножницы машина 2 такта триммер для живых изгородей, запчасти

Share on (62037511985):


Price:213,00 $ - 229,00 $

Quantity:


Product Overview

Description


_-

Description

 

1,kawasak 2 stroke power hedge trimmer parts designed exclusively for hedge trimmer with full anti-vibration system, making it ideal for prolonged periods of use in a commercial environment.

2,kawasak 2 stroke power hedge trimmer parts brings with it incredible high quality and power, yet reduces emmiission and uses less fuel.

3,Kawasaki 23cc engine hedge trimmer professional design.

4,Anti-vibration system

Paper air filter is more environmentally friendly

ModelHT-TJ23V
Displacement(CC)22.5
Standard Power(KW/r/min)0.65KW/7500rpm
Form of carburetor        WYL diaphragm type
Mixed fuel radio50:1
Tank capacity(L)0.47
Blade formdual
Pitch of teeth (mm)35
Length of blade(mm)600
Width of blade(mm)58

 

zt.jpg

 

 

 

 

sk.jpgsw.jpg

--our service--FAQ-

1. When can I get the quotation ? 

A: We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority. 

  

2. How can I get a sample to check your quality? 

A: After price confirmation, you can require for samples to check our quality. 
If you need the samples, we will charge for the sample cost. But the sample cost can be refundable after you place an order in the future.

 

4. Can I add my logo on the carton and stickers?

A:Yes, we can do OEM service, but you need send your carton & sticker design to us.

 

 5. What is your MOQ?

A: Normally, we do not have MOQ. If you need do OEM, the MOQ is 500 pcs.

 

6. What kind of files do you accept for printing?

A: PDF, PSD, EPS, Core Draw, high resolution JPG 

 

7. How long can I expect to get the sample? 

A: After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 2-5 days. 

 

8. What about the lead time for mass production? 

A: Honestly, it depends on the order quantity and the season you place the order. The lead time of MOQ is about 15 to 20 days.

 

9. What is your terms of payment? 

A: By T/T, 30% at first, 70% after loading or see the copy of bill of loading.

 

10. What is your terms of delivery? 

A: We accept EXW, FOB, CIF, etc. You can choose the one which is the most convenient or cost effective for you.


0.201 s.